My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
04-18-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2016 11:46:55 AM
Creation date
4/27/2016 11:46:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • Paved Multi-use Trails: The City is favor of constructing a paved snowmobile/bicycle trail along <br /> the north side of CSAH 11. Ideally the trail would serve as an east/west connection between <br /> Breezy Point and Pequot Lakes. Once the trail meets Bergquist Drive from the east, it would <br /> likely be routed north of City Hall so it would not impact traffic on CSAH 11 west of Bergquist <br /> Drive. The City will explore the feasibility of the trail with the local snowmobile clubs. <br /> • Side7alks: Pedestrian mobility in this corridor, especially near the downtown area, is critical. <br /> The city is in favor of wide sidewalks along both sides of CSAH 11. The sidewalks should be <br /> constructed in adjacent to the developed property along CSAH 11. The corridor should be <br /> designed so that they may be extended as development intensifies east of the currently <br /> developed properties. <br /> • Stamped Asphalt Crosswalks: One policy in the Transportation section of the Pequot Lakes <br /> Comprehensive plan states that the City should, "Ensure that local roads and streets enhance <br /> the public realm." It also states that, "Streets need to be designed so that they add value to <br /> adjacent properties and induce higher levels of private-sector development throughout the <br /> City's traditional neighborhoods." The City is in favor of using stamped asphalt pedestrian <br /> crosswalks instead of basic striping. The stamped asphalt will enhance the public realm and <br /> contribute to the overall "feel"the City is trying to achieve in the area. <br /> • Utility Lines: Many of the utility lines throughout the CSAH 11 corridor are currently above <br /> ground. Even though these lines are vital to the property owners along the street, they are not <br /> aesthetically pleasing. The reconstruction of the CSAH creates an excellent opportunity to bury <br /> these lines. <br /> • Pedestrian Scaled Lighting: Much of the existing lighting throughout the City is scaled for <br /> automobiles. It is tall and not aesthetically pleasing. The City is in favor of installing decorative <br /> lighting that is scaled for pedestrians in the CSAH 11 corridor, specifically in the developed areas <br /> of the street. <br /> • Parking:The city is in favor of retaining parallel parking on both sides ot(the street'of CSAH 11. <br /> n <br /> The parked cars create a "wall of separation" between pedestrians on the sidewalk and the cars <br /> moving on the roadway. This parking is especially important near the existing businesses <br /> adjacent to CSAH 11. <br /> • Curb/Gutter: The reconstruction of CSAH 11 creates an opportunity to rebuild/extend the <br /> existing curb and gutter along the existing roadway. The city is in favor of installing curb and <br /> gutter from the existing Highway 371 east to Bergquist Drive. Additional curb and gutter may be <br /> installed as the rest of the corridor develops. <br /> WWW.COMMUNITYGROWTH.COM WWW.STRONGTOWNS.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.