My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
05-16-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2016 11:01:37 AM
Creation date
4/27/2016 11:01:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Curb/Gutter: The reconstruction of CSAH 11 creates an opportunity to rebuild/extend the <br /> existing curb and gutter along the existing roadway. The City is in favor of installing curb and <br /> gutter from the existing Highway 371 east to Bergquist Drive. Additional curb and gutter may be <br /> installed as the rest of the corridor develops. <br /> • Landscaping: The City is not in favor of adding turf grass or flowers along the roadway. The <br /> City instead would like to showcase artists' work in this corridor. This could include statues, <br /> murals, benches,etc. <br /> • Medians: The City is not interested in maintaining center medians. Although medians can <br /> contribute to the overall "sense of place," and enhance vehicle and pedestrian safety, the City <br /> has opted for other alternatives to achieve those goals. <br /> • Lighting: Because this is a "gateway" to the city, lighting should be decorative and strian <br /> scaled. The City is in favor of lighting the entire corridor (exiting Highway 37110 the bypass 'to <br /> enhance the"feel" and to provide safety for pedestrians and drivers. <br /> WWW.COMMUNITYGROWTH.COM WWW.STRONGTOWNS.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.