Laserfiche WebLink
May 21, 2013 <br /> Mayor Nancy Adams <br /> Pequot Lakes City Hall <br /> 4638 County Road 11 <br /> Pequot Lakes, MN 56472 <br /> RE: Shoreline Restoration <br /> City of Pequot Lakes <br /> Dear Mayor Adams, <br /> As of this past weekend(May 17 & 18, 2013),we have accomplished the modifications to our <br /> shoreline that were verbally agreed to by all those present(including yourself, Planning <br /> Commission Vice Chair Tom Adams, and new Planning Commission Chair, Cheri Seils) at the <br /> September 20, 2012 meeting of the City of Pequot Lakes Planning And Zoning Commission. <br /> Specifically that included: <br /> • That the side of the shoreline west of where our dock is placed is to be left as it is. <br /> • We have spread the contents of twenty 40-pound bags of topsoil on the riprap along the east <br /> side of the shoreline (See enclosed Photos 1-4). <br /> • We have spread grass seed,a wildflower mix, and a mix of marigold and Zinnias on the <br /> topsoil that was placed on the riprap along the east side of the shoreline(See enclosed <br /> Photos 5-7). <br /> It should be noted that we had very unusual winter and spring seasons in that there was virtually no <br /> ice damage done to our shoreline and therefore no so-called"natural berm" exists on the east side of <br /> the shoreline. <br /> It would be much appreciated if we could receive notification of your concurrence that we've <br /> indeed accomplished what was agreed to in the meeting, and therefore puts an end to this business. <br /> Sincerely, <br /> 0 Doug&Lmda Cooper <br /> 6750 Babcock Trail <br /> Inver Grove Heights,MN 55077-2504 <br /> (651)455-6913 Home Phone <br /> (612)270-0998 Cell Phone <br /> Email: daclsc @usfamily.net <br /> Cabin Property <br /> 5553 Wilderness Road <br /> Pequot Lakes,MN 56472 <br /> (218) 568-5292 <br /> Enclosed Photos 1 - 7 <br />