My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A - Review Variance Application Form
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
07-18-2013 Planning Commission Meeting
>
7A - Review Variance Application Form
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2016 8:49:55 AM
Creation date
4/26/2016 8:49:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PEQUOT LAKES <br /> VARIANCE APPLICATION <br /> APPLICATION: <br /> A. Applicant shall complete Variance Application provided by Zoning Department and submit to <br /> Zoning Department 30 days prior to scheduling public hearing. <br /> B. Application shall be accompanied by nine (9) prints of site plan drawing complete with as a <br /> minimum the information from Variance Checklist. <br /> C. Application shall be accompanied by application fee made payable to the City of Pequot Lakes. <br /> This fee does not cover the land use permit, which must be filed separately, if <br /> necessary. <br /> REVIEW: <br /> A. Planning and Zoning Department shall review the application for completeness and assign a <br /> reference number to application,plans,and any other attachments. Applicant shall be notified <br /> within ten days if additional information is required to complete the application. <br /> B. After receipt of a completed Variance Application and supporting documents, the Zoning <br /> Department shall schedule a public hearing date on the Planning Commission's agenda for the <br /> earliest possible opening. Applicant will be notified by mail of the date and time of the public <br /> hearing. <br /> C. City Staff will prepare a Staff Report on the application. The Staff Report will be available for <br /> public review at City Hall no later than one week prior to the scheduled meeting date. <br /> D. The City Fee Schedule is based on average processing and review costs for _variance Deleted:land use <br /> applications. When costs exceed the original application fees,the applicant shall reimburse the <br /> City for any additional costs. Such expenses may include, but are not limited to, payroll, <br /> mailing costs, consultant fees and other professional services the City may need to obtain in <br /> reviewing permits. The City may withhold final action on a variance applications/or hold the Deleted:land-„�application and <br /> release of a construction permit until all fees are paid. <br /> ACTION: <br /> A. The Planning Commission shall hold a public hearing on the variance application. <br /> B. At the conclusion of the public hearing,and after consideration of the testimony presented,the <br /> Planning Commission shall make a decision. <br /> 1 REV:""e,.,r.°��nno <br /> JUNE,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.