My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9B - Minutes 080813
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
08-15-2013 Planning Commission Meeting
>
9B - Minutes 080813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 4:01:59 PM
Creation date
4/25/2016 4:01:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chair Seils opened Public Comment. <br /> Public Comment: None <br /> Chair Seils closed Public Comment. <br /> City water and wastewater is not available. <br /> A motion was made by Bill Habein, seconded by Deb Bro ' recommend the <br /> City Council approve the Preliminary Plat of Timber Ri , waiving the <br /> requirement that the non-conforming structures be b into conformity, <br /> based on the following Findings of Fact: <br /> 1. The applicant is proposing to subdi ' � e prope ed at 30827 <br /> Pequot Boulevard into three residen ' lots and two outloo <br /> 2. The property is currently zoned " 'ne Co ercial," bu �prope� <br /> owner has submitted a request for it b °`Shoreline esidential." <br /> 3. The land is properly zoned (if rezoning a tion 13-4215 is approved) in <br /> its natural state for the int ed residential oses. <br /> 4. The subject property conta% j on-confor s cture on proposed <br /> "Lot 3" (attached deck on thk structu croaches in the bluff <br /> setback). Proposed "Outlot co essory structure which <br /> encroaches into osed"Lot 1l <br /> `. 5. Proposed j ontain a quate c ntiguous lawn area for the <br /> constructi j f two- andard pi' ate sewer systems. "Outlot A" and <br /> Outlot �jbe c solidated adjacent properties that already <br /> contain private <br /> 6. Pr is con the minimum requirements of the <br /> " oreline . enti one. <br /> t layouts ar pate th the existing layout of adjoining properties. <br /> proposed uts 11 not constrain the future development of <br /> a t properti <br /> 8. The osed si lot lines for each of the lots are at right angles to <br /> straight lin or radial to lake shores. <br /> 9. "Lot 1, t 3," and "Outlot B" have adequate frontage on Pequot <br /> Boulevard. utlot A" does not have frontage on public right-of-way but <br /> the property it is being consolidated with has adequate frontage on Pequot <br /> Boulevard. <br /> lo.The proposed development does not contain any streets. <br /> 11. There are not any known or proposed easements for public utilities on the <br /> subject property. <br /> 12. Each of the lots, with conditions, will not require a variance to allow their <br /> intended purposes. <br /> 13. The Minnesota DNR has been notified of this request. They have not <br /> raised any concerns. <br /> MINUTES 3 <br /> Pequot Lakes Planning Commission <br /> Special Meeting <br /> August 8, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.