My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
10-17-2013 Planning Commission Meeting
>
10 - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 2:41:35 PM
Creation date
4/25/2016 2:41:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Dawn``Bittner <br /> From: Tuttle, Nathan [Nathan.Tuttle @landisgyr.com] <br /> Sent: Monday, September 16, 2013 10:38 AM <br /> To: Hallgren, Jim (DOT) <br /> Cc: Dawn Bittner; Sandy Peine; Humbert, Terry (DOT); Anderson, Dan D(DOT); Daubenberger, Nancy <br /> (DOT) <br /> Subject: RE: Citizen's in favor of new bridge development in Pequot Lakes <br /> Dear Mr. Hallgren, <br /> Thanks for the reply and I must admit I completely forgot about the 371 project. I had a discussion with one of <br /> my co-workers who actually has the blueprints for the new highway plan. I requested to take a look and 1 do <br /> realize that things will change and in spite of this my idea remains the same. <br /> My plan was to raise funds for a pedestrian bridge and get materials and time donated to construct it. <br /> When I complete my snowmobile training course I noted that it said that the DNR welcomed contributions of <br /> materials and money for bridges such as this. <br /> Again thanks for the correspondence and bringing the new plan to my attention.This does not need to be a <br /> hurried thing, I am willing to make plans and foster interest for a perspective plan sometime down the road (no <br /> pun intended). <br /> Thanks <br /> Nathan Tuttle <br /> From': Hallgren, Jim (DOT) [mailto:james.haligren @state.mn.us] <br /> Sent: Monday, September 16, 2013 10:17 AM <br /> To: Tuttle, Nathan <br /> Cc: dbittner @pequotlakes-mn.gov; Sandy Peine(speine @pequotlakes-mn.gov); Humbert,Terry (DOT); <br /> Anderson, Dan D (DOT); Daubenberger, Nancy(DOT) <br /> Subject: FW: Citizen's in favor of new bridge development in Pequot Lakes <br /> Dear Mr. Tuttle, <br /> Thank you for your note. There are a few things that weigh into the discussion of a pedestrian <br /> bridge over Highway 371 in Pequot Lakes. First, Mn/DOT has been working with the City of <br /> Pequot Lakes on a four-lane expansion and realignment of Highway 371 east of downtown.The <br /> project is scheduled for 2018.Traffic patterns will change as a result of this project, likely <br /> resulting in a positive effect for pedestrians and bicyclists crossing the existing highway.The cost <br /> of a multiuse trail bridge also weighs in to the discussion.The cost of a structure of this nature <br /> typically runs in the neighborhood of$1.5 million to $2 million.These would be shared cost with <br /> a local partner(s) (i.e. county, city, state agency (DNR)). <br /> Given the proposed realignment project in the near future, cost, and lack of a local partner at this <br /> time, our district would have a difficult time supporting a new trail bridge over highway 371. <br /> Sorry to be the bearer of bad news. These are just some of the things that need to be <br /> considered. <br /> Sincerely, <br /> 9/16/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.