My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
10-17-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 2:41:13 PM
Creation date
4/25/2016 2:40:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Concept Three: <br /> This concept closes existing Highway 371 between Main Street and Sibley Street. It <br /> creates ample development opportunity on existing infrastructure surrounding the public <br /> space. Commercial and mixed use development(e.g. retail, ground level/residential, <br /> upper level) around the perimeter of the public space would form the sides or"walls"of <br /> the public space making it a more defined area. These businesses would also have direct <br /> access to the park on the backside of their buildings(e.g. dining patio,live music, etc.). <br /> This concept has narrow two way streets encompassing the central square.The Paul <br /> Bunyan Trail may need to be realigned 20-30 feet to the west so there is sufficient space <br /> for development along the east edge of the square. <br /> Red: Mixed Use Orange: Public Blue: Two-way street <br /> bill <br /> ` P <br /> �. <br /> 1 <br /> x. <br /> .r <br /> - `. 1► ` <br /> t A :, <br /> Pequot Lakes Staff Report 5 <br /> October 17,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.