My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
11-21-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 2:13:06 PM
Creation date
4/25/2016 2:12:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Woodman Street north to CSAH ii <br /> • Urban street <br /> • Remove shoulder <br /> • Remove Center turn-lane <br /> • Remove right turn lane <br /> • Consider vacating ist Street <br /> • Narrow driving lanes to 9 ft or io ft width <br /> • Add parallel parking lanes on both sides of street 8 ft or 9 ft wide <br /> • Add bike paths on both sides 6 ft or 5 ft <br /> • Add sidewalk on west side and possibly on east side <br /> • Plant additional trees <br /> • Install street lighting <br /> • Curb and gutter <br /> .,�;ow It <br /> Original Planning Commission design: <br /> Highway 371 Committee Comments: <br /> • Consider eliminating west parallel parking lane and using 1st Street for parking <br /> instead <br /> Pequot Lakes Staff Report <br /> November 21,2013 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.