My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Downtown Plan Update
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
09-18-2014 Planning Commission Meeting
>
Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 1:09:38 PM
Creation date
4/25/2016 1:09:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Establish a splash pad or other water-based recreational amenity in the Grow Zone or the surrounding neighborhoods for <br /> use during the summer months. <br /> ❑ Construct a grade-separated bicycle trail between the downtown area and Eagle View Elementary School along the <br /> Highway 11 corridor. <br /> Transportation <br /> Short-Term Actions (within 1 year): <br /> ❑ Perform an inventory and life-cycle analysis of all public infrastructure maintained by the City. Use this to create a capital <br /> improvements plan that provides for ongoing maintenance of public infrastructure. <br /> ❑ Adopt new standard street sections that reduce long-term costs by narrowing lane widths to appropriate neighborhood <br /> scale,accommodate sidewalks,and provide safe pedestrian mobility throughout the city. <br /> ❑ Adopt new standard road sections that reduce long-term costs by narrowing lane widths on local roads to a rustic, low <br /> volume, low speed scale. <br /> ❑ Ensure that improvements to Government Drive provide a platform for growth. <br /> ❑ Provide bike racks to encourage bike usage and storage lockers for roller blades. <br /> ❑ Create a city policy establishing when newly constructed roads will be accepted by the City for long-term maintenance.The <br /> policy should be based on reasonable assurance that the long-term maintenance costs will be sufficiently balanced by the <br /> additional tax revenue generated. <br /> Mid-Term Actions (1-5 years): <br /> ❑ Work with Crow Wing County to properly-scale the TH 371 and CSAH 11 corridors through the Grow Zone area following <br /> the construction of the TH 371 Alternate Alignment. Ensure that these corridors maintain a character that encourages <br /> pedestrian activity throughout the Grow Zone. <br /> � Infrastructure <br /> Short-Term Actions (within 1 year): <br /> ❑ Perform an inventory and life-cycle analysis of all public infrastructure maintained by the City. Use this to create a capital <br /> improvements plan that provides for ongoing maintenance of public infrastructure. <br /> ❑ Establish an availability charge for properties that have access to municipal infrastructure but have not yet connected. <br /> Mid-Term Actions (1-5 years): <br /> ❑ When city vehicles are retired,ensure that their replacements can function effectively within a dense downtown served by <br /> neighborhood-scaled streets. <br /> ❑ Establish a Wellhead Protection Overlay District to regulate the installation of wells and the establishment of uses that <br /> could threaten the aquifer within the wellhead area. <br /> Pequot Lakes Staff Report <br /> September 18,2014 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.