Laserfiche WebLink
Short-Term Actions (within 1 year): <br /> ❑ Perform an inventory and life-cycle analysis of all public infrastructure maintained by the City. Use this to create a capital <br /> improvements plan that provides for ongoing maintenance of public infrastructure. <br /> ❑ Establish an availability charge for properties that have access to municipal infrastructure but have not yet connected. <br /> Mid-Term Actions (1-5 years): <br /> ❑ When city vehicles are retired,ensure that their replacements can function effectively within a dense downtown served by <br /> neighborhood-scaled streets. <br /> ❑ Establish a Wellhead Protection Overlay District to regulate the installation of wells and the establishment of uses that <br /> could threaten the aquifer within the wellhead area. <br /> Pequot Lakes Staff Report <br /> October 16,2014 3 <br />