My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B - Downtown Plan Update
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
11-20-2014 Planning Commission Meeting
>
8B - Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 9:21:08 AM
Creation date
4/25/2016 9:20:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Incremental Repair <br /> • Slow the traffic by narrowing driving lanes. Stripe center line and edges. <br /> • Signage for the park and public access for Sibley Lake. <br /> West Lake Street <br /> n <br /> Neighborhood Composition <br /> West Lake Street serves as one of the two main linkages between the highway and the public high <br /> school. Other than the School District property,the adjacent property is commercial. West Lake Street <br /> has a sidewalk for the entire length of the south side of the street and for approximately a quarter of the <br /> length on the north side of the street. <br /> Utility Overview <br /> • Sanity sewer <br /> • City water <br /> • Storm sewer <br /> Street Maintenance Revenue: $16,844 <br /> Street Maintenance Cost: $116,100 <br /> Percent of Cost Covered by Adjacent Property Tax: 15% <br /> Walkability Score: Poor <br /> Redevelopment Potential: Medium <br /> Incremental Repair <br /> • Striping for parallel parking along both sides of the street. <br /> • Pedestrian crosswalks at all intersections. <br /> • Screen the propane tank storage area owned by the gas company. <br /> Pequot Lakes Downtown Plan— Updated November 2014 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.