My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B - Downtown Plan Update
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
11-20-2014 Planning Commission Meeting
>
8B - Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 9:21:08 AM
Creation date
4/25/2016 9:20:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Front Street <br /> �Y <br /> .� .4 <br /> X r, <br /> s <br /> .Mrb t�ib� <br /> Neighborhood Composition <br /> Front Street runs north and south and consists of commercial businesses on both sides of the street. <br /> The businesses located on the west side of the street are arranged in a pedestrian-friendly fashion while <br /> the placement of the structures on the east side of the street is predominately designed for <br /> automobiles. The southern end of the street's view terminates at the TDS building and the north view <br /> terminates with the highway. Front Street has a very high redevelopment potential and is critical to the <br /> overall success of the Grow Zone. <br /> Utility Overview <br /> • City Sanity Sewer <br /> • City Water <br /> • Storm sewer <br /> Street Maintenance Revenue: $54,243 <br /> Street Maintenance Cost: $194,400 <br /> Percent of Cost Covered by Adjacent Property Tax: 28% <br /> Walkability Score: Moderate <br /> Redevelopment Potential: High <br /> Incremental Repair <br /> • Mark crosswalks at each intersection. <br /> Pequot Lakes Downtown Plan— Updated November 2014 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.