My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 - Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
09-03-2013 Council Meeting
>
06.01 - Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 9:35:32 AM
Creation date
12/17/2013 2:49:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Burslie pointed out the City Council wants the ideal vision of what this <br />corridor could be. The corridor would need to look like a city street and not like a <br />parking lot. <br />Excess right-of-way could be turned back to property owners or redeveloped. <br />The west side could be redeveloped as a new concept in a perfect world. It would <br />increase the tax base. The roadway could be moved to the east in the existing <br />right-of-way creating more saleable land on the west, although it is expensive to <br />move bituminous. Contracts would need to be in place requiring a building be <br />constructed within a certain amount of time. <br />Mr. Burslie explained the Highway 371 Turnback 1Vteeting held earlier in the <br />week. The maintenance of this 3 mile stretch could.patentially double or triple <br />the maintenance budget. The City Engineer is going to ask the City Council if the <br />City should accept this turnback; it could remain a CSAH. The City Engineer is <br />collecting numbers. If the City accepts this roadway it will add roughly i5% more <br />roadway to the City's system. <br />It was determined the Planning Commission needs more information on the <br />statutes for turnbacks. The Planning Commission also wondered if it is better for <br />the City to have a say in the redevelopment or to have th� County keep it and <br />maintain it. <br />The City Engineer will summarize the Turnback Meeting for the City Council. <br />There has been a change in the Council since it was last discussed and he will ask <br />for direction for the Committee. The Committee will meet before the next <br />Planning Commission meeting; Staff will bring back the outcome of that meeting. <br />J� <br />The frieeting was called to order ��'Chair Seils at �:oo p.m. <br />Chair Seils opened the Public Hearings. <br />PUBLIC HEARINGS: <br />APPLICANTS: Patrick Smith and Robert Rickard <br />Applicants Request Final Plat of Timber Ridge <br />Mr. Burslie explained the Staff Report. Applicants were present. Staff <br />recommends the Final Plat be approved. <br />Mr. Burslie pointed out an issue that surfaced since the Preliminary Plat public <br />hearing. There is a private sewer system that Staff wrongfully assumed was going <br />to be abandoned. Staff is working with applicant and hope to address this prior <br />to the City Council meeting. <br />MINUTES <br />Pequot Lakes Planning Commission <br />August 15, 2013 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.