Laserfiche WebLink
proposed use is needed in the shoreland because it expands the existing facility, <br /> which is already located in the shoreland. <br /> 16. The amount of liquid waste generated has not been calculated, except to <br /> acknowledge that the treatment facility will exceed 10,000 gallons per day and <br /> therefore will need to be designed by a licensed engineer. There is adequate room <br /> available on the property for the construction of such a facility. <br /> 17.New construction will occur in areas that are elevated and mostly screened from <br /> view from the lake, during leaf on conditions. There will be no vegetation <br /> removal within the bluff. <br /> 18. There is no standard set forth for determining the safe level of watercraft on the <br /> lake. <br /> A. The existing Wilderness Point Resort is permitted for 40 mooring spaces. <br /> B. The applicants are proposing 40 mooring slips. <br /> C. The Ordinance provides for a number of docks not to exceed first tier <br /> dwelling units. There are 23 dwelling units allowed in the first tier at <br /> residential densities. There are 40 dwelling units allowed in the first tier at <br /> commercial densities with an average square footage of 1,800. <br /> D. There have been no formal or substantiated complaints that boating <br /> activity on the lake has been unsafe. The City is aware of no complaints, <br /> formal, substantiated or otherwise. <br /> E. There have been no accidents caused by the level of boating activity <br /> reported on Middle Cullen Lake. <br /> F. The current level of dockage has not been demonstrated to create an <br /> unsafe condition. <br /> On the application process for a PUD <br /> 19.The survey submitted by the applicant indicates all of the information required by <br /> Section 17-9.2 of the Land Use Ordinance. The information shown includes: <br /> property boundaries, surface water features, existing and proposed structures, land <br /> alterations, sewage treatment systems and water supply systems, and topographic <br /> contours at two feet intervals. <br /> 20. The applicant has not submitted an updated property owner's association <br /> agreement. <br /> 21. The applicant has not submitted updated documents pertaining to deed <br /> restrictions,covenants, or easements. <br /> On the site suitability and density analysis <br /> 22. There are 60 proposed dwelling units. The allowable and requested total lot <br /> coverage in each tier is as follows(in square feet): <br /> A. Tier 1: 41,776 allowable,41,776 proposed <br /> B. Tier 2: 31,020 allowable,27,994 proposed <br /> C. Tier 3: 57,549 allowable, 36,145 proposed <br /> 23. The total area of the site is approximately 41 acres. <br /> 24. There is approximately 35.5 usable acres. <br /> 25. The proposed PUD meets density and coverage requirements. <br /> 26. The existing lodge is to be replaced with a new lodge facility. <br /> 5 <br />