Laserfiche WebLink
6. The applicant has established that there are practical difficulties in complying <br /> with the code as the structure is pre-existing/con-conforming and cannot be <br /> `— expanded without a variance. <br /> 7. Much of the subject property area is classified as a "bluff" The pre-existing <br /> structure was constructed by a previous landowner within the bluff impact zone. <br /> The plight of the landowner is due to circumstances unique to the property and <br /> not created by the landowner. <br /> 8. The deviation from the ordinance, with conditions, will still be in harmony with <br /> the general purposes and intent of the ordinance and comprehensive plan. <br /> 9. Single family dwellings are a permitted use in the Shoreline Residential Zone. <br /> The variance will not create a land use not permitted in the Shoreline Residential <br /> Zone. <br /> 1o. The subject property is surrounding by residential development. The variance <br /> will not alter the essential character of the locality of the subject property. <br /> 11. The variance does not appear to be for economic reasons alone and reasonable <br /> use of the property seems to exist under the code. <br /> Board of Adjustment Direction: The Board of Adjustment can approve of the <br /> variance application, deny the application, or table the request if additional information <br /> is needed. If the motion is for approval or denial,findings of fact should be cited. <br /> Staff Recommendation: The proposed additions to the structure are outside the lake <br /> setback, the proposed impervious surface coverage of the property is only half of the <br /> allowance and an adequate stormwater management plan for the property has been <br /> submitted. We recommend the application be approved with the following conditions: <br /> i. Before any land is disturbed for construction purposes, appropriate temporary <br /> erosion control measures (including the use of a silt fence on the lake-side of the <br /> principal structure) shall be installed. Staff shall verify these measures before <br /> construction activities commence. The erosion control devices shall remain in <br /> place until construction on the property is complete and all the disturbed areas <br /> are restored. <br /> 2. A detailed drawing verifying the height of the proposed modified principal <br /> structure is below 25 feet as defined by ordinance shall be submitted with the <br /> land use application. <br /> 3. In accordance with Section 4.3 "Use of Pre-Existing Lots," Lot i and Lot 2 shall be <br /> consolidated before a land use permit is issued for the subject property. <br /> 4. The stormwater management plan dated March 21, 2014 shall be implemented in <br /> full. <br /> Pequot Lakes Staff Report 4(a)-5 <br /> April r7,2014 <br />