Laserfiche WebLink
Pequot Lakes Staff Report 3 (b) - 5 <br />March 17, 2016 <br />D. Map C depicting proposed final grade after deposit is removed and <br />area restored. <br /> <br />E. Type of resources or materials to be removed. <br /> <br />F. Proposed method of removal and whether or not blasting or other <br />use of explosives will be required. <br /> <br />G. Description of equipment to be used, including any proposed <br />accessory uses such as hot mix plants or crushing operations. <br /> <br />H. Method of rehabilitation and reclamation of the pit area, including <br />timeframe for rehabilitation. <br /> <br />I. Identification of haul roads and amount of truck activity at highest <br />and average levels on those routes, including ADT (average daily <br />total) counts. <br /> <br />J. Hours of operation and expected life of operation. <br /> <br />K. Types of barriers to be used, if necessary, to ensure the safety of <br />people and livestock residing within proximity to the proposed <br />area of excavation. <br /> <br />L. Proposed methods of avoidance or mitigation of the impacts on <br />natural resources caused by the proposed use. <br /> <br />M. Detailed plans indicating anticipated vegetative and topographic <br />alterations. <br /> <br /> <br />Planning Commission Direction: The Planning Commission can approve <br />the Ordinance Amendment, deny the application, or table the request if <br />additional information is needed. <br /> <br />Staff Recommendation: We recommend that the application be approved. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />