My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Funk CUP SR
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
07-16-2015 Planning Commission Meeting
>
Funk CUP SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:19:01 PM
Creation date
4/21/2016 2:18:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pequot Lakes Staff Report 3 - 9 <br />April 16, 2015 <br />operation of such equipment interferes unreasonably with the <br />desired quiet residential environment of the neighborhood or if the <br />health and safety of the residents is endangered. No equipment <br />shall be used in the home occupation which will create electrical <br />interference to surrounding properties. <br /> <br />J. A person having a home occupation shall provide proof of meeting <br />the above requirements upon request by the City. <br /> <br />Section 17-11.6 CONDITIONAL USE PERMITS <br /> <br /> 1. Conditional Use Permits shall be issued to the property for structures or <br />other specified uses after a public hearing and approval by the Planning <br />Commission. All applications for a Conditional Use Permit shall be submitted to <br />the Zoning Administrator 30 days ahead of the hearing date, accompanied by a <br />certificate of survey (unless waived by the Zoning Administrator) showing the <br />details of the proposal and an accurate legal description, along with the <br />appropriate fee. The fee or contract owner of the property shall sign the <br />application. The Zoning Administrator shall notify all property owners within a <br />minimum of 350 feet by regular mail and shall advertise the hearing once in the <br />legal section of the official newspaper at least 10 days ahead of the public <br />hearing. The Zoning Administrator shall send the same notice 10 days in advance <br />of this hearing to the DNR if the proposed is in shoreland. At the applicant’s <br />option, the applicant may request a sketch plan review with no action by the <br />Planning Commission and omit by giving 14 days notice thereof to the Zoning <br />Administrator, meeting time permitted. <br /> <br /> 2. Submissions for Conditional Use Permit. The applicant shall complete the <br />Conditional Use Permit application approved by the City Council. The <br />application shall contain submittal requirements, criteria for approval, procedure <br />for consideration and City contact information. The City shall not accept <br />applications where the applicant has past due fees or charges due to the City until <br />the account is made current. <br /> <br /> 3. In permitting a new Conditional Use or alteration of an existing <br />Conditional Use, the Planning Commission may impose, in addition to the <br />standards and requirements expressly specified by this Ordinance, additional <br />conditions that the Planning Commission considers necessary to protect the best <br />interest of the surrounding area or the City as a whole. These conditions may <br />include, but are not limited to the following: <br /> <br />A. Increasing the required lot size or yard dimension. <br /> <br />B. Limiting the height, size or location of buildings. <br /> <br />C. Controlling the location and number of vehicle access points.
The URL can be used to link to this page
Your browser does not support the video tag.