My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Donjek Report_001
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
07-16-2015 Planning Commission Meeting
>
Donjek Report_001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:18:36 PM
Creation date
4/21/2016 2:18:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P-üüilrfi <br />l¿kes- <br />CovrpnnrrENsrtrE Pr¿N - Rnvrsw DoN.rBr RnpoRr <br />Agenda ltem: Z @) <br />Background Information: Last month the Planning Commission reviewed <br />the Transportation Section of the Comprehensive Plan. The construction of the <br />alternate alignment of State Highway gZr will become a realþ in the very near <br />future. <br />In zooT the Cþ of Pequot Lakes held many meetings and the Higfuaay g7t <br />Alternate Route Study Group Reportwas completed in Septembe\2oo7. <br />At the June Planning Commission meeting it was suggested that the Donjek <br />Report portion of the Highusay 37t Alternate Route Study Group Report be <br />reviewed. The Report is attached. <br />Pequot Lakes Staff Report <br />July 16, zor5 <br />z@)-t
The URL can be used to link to this page
Your browser does not support the video tag.