My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hanson CUP SR
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
05-21-2015 Planning Commission Meeting
>
Hanson CUP SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:11:51 PM
Creation date
4/21/2016 2:11:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pequot Lakes Staff Report 4 (a) - 4 <br />May 21, 2015 <br />pedestrians. Sidewalks and paths shall connect the development to <br />adjacent land uses and provide connections through the <br />development to the public street right-of-way. <br /> <br /> C. Lighting. All building entrances, pathways and other pedestrian <br />areas shall be lit to two-foot candles with pedestrian-scale lighting <br />including wall mounted, sidewalk lamps, bollards, or landscape <br />up-lighting. <br /> <br /> D. Fences. Fences not exceeding 72 inches in height may be <br />constructed. Fencing shall only be constructed closer than 10 feet <br />from the surface of a public road with the permission of the <br />Planning Commission and in all cases not within the public right- <br />of-way. Materials shall consist of usual fencing materials with <br />posts and fence of metal, wood, concrete, brick or smooth wire. <br />Barbed or electrified wire is allowed only with the permission of <br />the Planning Commission. <br /> <br /> <br /> <br />Section 17-5.15 LAND USE MATRIX <br /> <br />USE DMU <br />Commercial Use (Other, Not <br />Classified) C <br /> <br /> <br /> <br />Section 17-11.6 CONDITIONAL USE PERMITS <br /> <br /> 1. Conditional Use Permits shall be issued to the property for structures or <br />other specified uses after a public hearing and approval by the Planning <br />Commission. All applications for a Conditional Use Permit shall be submitted to <br />the Zoning Administrator 30 days ahead of the hearing date, accompanied by a <br />certificate of survey (unless waived by the Zoning Administrator) showing the <br />details of the proposal and an accurate legal description, along with the <br />appropriate fee. The fee or contract owner of the property shall sign the <br />application. The Zoning Administrator shall notify all property owners within a <br />minimum of 350 feet by regular mail and shall advertise the hearing once in the <br />legal section of the official newspaper at least 10 days ahead of the public <br />hearing. The Zoning Administrator shall send the same notice 10 days in advance <br />of this hearing to the DNR if the proposed is in shoreland. At the applicant’s <br />option, the applicant may request a sketch plan review with no action by the <br />Planning Commission and omit by giving 14 days notice thereof to the Zoning <br />Administrator, meeting time permitted.
The URL can be used to link to this page
Your browser does not support the video tag.