Laserfiche WebLink
<br />MINUTES 6 <br />Pequot Lakes Planning Commission <br />March 19, 2015 <br /> <br /> <br />City Planner Burslie stated the applicant indicated 30 feet in height in the most sensitive <br />area for the berm. Mr. Wickham agrees to increase berm height from haul road west <br />along northern edge of extraction area. <br /> <br />Mr. Wickham stated he would agree to 7 AM to 9 PM maximum hours for crushing. <br /> <br />It was the consensus of the public and the applicant that the berm would remain as <br />indicated on the application. The parties will work together when excavation <br />commences on noise solutions. <br /> <br />A MOTION WAS MADE BY PLANNING COMMISSION MEMBER WILSON, <br />SECONDED BY PLANNING COMMISSION MEMBER BROWN, TO <br />APPROVE THE CONDITIONAL USE PERMIT FOR AN EXTRACTIVE USE <br />WITH THE CHANGE IN TIME, BASED ON THE FOLLOWING FINDINGS OF <br />FACT: <br /> <br />1. The subject property meets the minimum lot size and use standards for the <br />Agriculture zone, being 40 acres in size, more than 500 feet wide, and having <br />ample space within the building envelope for the proposed operation. <br />2. The subject property lies within the Extractive Use Overlay District. <br />3. Applicant has supplied the required information including a site plan and a <br />completion plan, and has indicated that Wild Acres Road will serve as the primary <br />haul route. <br />4. The applicant has proposed to excavate a maximum 12 acre area, plus utilization <br />of an additional 5 acre stockpile/processing area. This excavation area is more <br />than 50 feet from all property lines. The edge of the proposed berm around the <br />area to be excavated is 60 feet from the western property line at its closest point. <br />5. The proposed excavation area is more than 50 feet from the right-of-way of Wild <br />Acres Road, being approximately 530 feet from the right-of-way. <br />6. The applicant has indicated traditional 4-wire fencing with signs will be used; <br />fencing exists along the north, west and south property lines and will be updated. <br />New fence will be installed on the east property line. <br />7. The applicant has proposed to use the natural and planted forested buffers as a <br />means of screening the excavation site and associated machinery. Topsoil and <br />overburden berms will be created surrounding excavation area and will act as <br />safety barriers, as well as stormwater, noise and dust buffers. <br />8. The excavation area is more than 1,200 feet from the nearest resident, located on <br />a property to the west of this parcel. There is also a residence on the property to <br />the east that is approximately 1,900 feet from the excavation area. The nearest <br />lake, Island Lake to the north, is more than 3,000 feet from the processing area, <br />and the nearest stream is more than one mile to the north of the site. The <br />excavation area is more than one mile outside of the Wellhead Protection Area.