Laserfiche WebLink
<br />Pequot Lakes Staff Report 7(b) - 6 <br />April 16, 2015 <br />I. Identification of haul roads and amount of truck activity at highest <br />and average levels on those routes, including ADT (average daily <br />total) counts. <br /> <br />J. Hours of operation and expected life of operation. <br /> <br />K. Types of barriers to be used, if necessary, to ensure the safety of <br />people and livestock residing within proximity to the proposed <br />area of excavation. <br /> <br />L. Proposed methods of avoidance or mitigation of the impacts on <br />natural resources caused by the proposed use. <br /> <br />M. Detailed plans indicating anticipated vegetative and topographic <br />alterations. <br /> <br /> <br />Staff Recommendation: Staff is bringing this to the Planning Commission as <br />a discussion item only. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />