<br />Pequot Lakes Staff Report 4(a) - 6 <br />March 19, 2015 <br /> <br />B. Air quality, dust, and noise control measures and the ability to <br />limit impact upon adjacent residential properties according to <br />MPCA standards. <br /> <br />C. The extent that the proposed extractive use, or its accessory uses, <br />impact the groundwater. <br /> <br />D. The ability of the applicant to control erosion and sedimentation <br />that may result from the proposed use. <br /> <br />E. The impact on the natural resources contained in the watershed in <br />which the proposed extractive use is located and the ability of the <br />applicant to avoid or mitigate any impacts. <br /> <br />4. Rehabilitation. To guarantee the restoration, rehabilitation, and <br />reclamation of mined-out areas, every applicant granted an extraction/mining <br />permit as herein provided shall furnish a performance bond running to the City in <br />an amount to be determined by the City Engineer, and acceptable to the Planning <br />Commission, as a guarantee that such applicant, in restoring, reclaiming, and <br />rehabilitating such land and haul road, shall, within a reasonable time and to the <br />satisfaction of the City meet the following minimum requirements: <br /> <br />A. Surface rehabilitation. All excavation areas shall be graded or <br />backfilled to contour and shape the peaks and depressions thereof, <br />so as to produce a gently drained surface that will minimize <br />erosion due to rainfall and which will be in substantial conformity <br />to the adjoining land area. Four (4) inches of black topsoil shall be <br />placed on all areas, except beaches, that will remain above water <br />level. Haul roads will be restored to their condition prior to the <br />beginning of the extraction operation, <br /> <br />B. Vegetation. Vegetation shall be restored by appropriate seeds of <br />grasses or planting of shrubs or trees in all parts of said mining <br />area where such area is not to be submerged under water as herein <br />above provided. <br /> <br />C. Banks of excavation not backfilled. The banks of all excavation <br />not backfilled shall be sloped not steeper than three (3) feet <br />horizontal to one (1) foot vertical and said bank shall require the <br />establishment of vegetation. <br /> <br />D. Reclamation of extractive use sites and designated haul roads shall <br />be completed within one (1) year after the cessation of the <br />operation, unless modified by the CUP. <br />