My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Anderson Brothers Staff Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
03-19-2015 Planning Commission Meeting
>
Anderson Brothers Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:04:56 PM
Creation date
4/21/2016 2:04:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pequot Lakes Staff Report 4(a) - 11 <br />March 19, 2015 <br />23. The applicant has not indicated that adequate measures have been taken <br />to provide sufficient off-street parking and loading space. However, given <br />the size of the site, there is more than ample space for off-street parking. <br />24. There are not any known significant historic, natural or scenic features <br />located on the property that would be damaged or destroyed by the <br />proposed use. <br />25. The proposed use will not contaminate groundwater as the proposed <br />extraction shall take place at least five (5) feet above the water table, if not <br />more. In addition, the necessary stormwater management permits will be <br />obtained to control stormwater onsite and prevent erosion. The nearest <br />surface water body, Island Lake, is more than 3,000 feet to the north of <br />the property, so it is unlikely that the proposed use will pollute surface <br />waters. <br /> <br /> <br />Planning Commission Direction: The Planning Commission can approve <br />the Conditional Use Permit, deny the application, or table the request if <br />additional information is needed. If the motion is for approval or denial, <br />Findings of Fact should be cited. <br /> <br />Staff Recommendation: Based on the Findings of Fact presented in this <br />report, the Staff recommends that the Conditional Use Permit Application be <br />approved with consideration given to the following conditions: <br />1. Applicant shall furnish a site specific Stormwater Prevention and Pollution <br />Plan to the City, as well as MPCA, NPDES and MPCA General Permit MN <br />G490001. <br />2. The berms shall be vegetated in such a way as to screen the excavation <br />area from view and to serve as a noise and dust buffer for area residences. <br />3. Applicant shall update fencing along the north, west, and south property <br />lines and shall install new fence along the east property line. <br />4. The applicant shall furnish a bond in an amount that is acceptable to the <br />City Engineer and the Planning Commission to serve as a guarantee that <br />the restoration and rehabilitation requirements are met to the satisfaction <br />of the City. <br />5. Extraction operations shall take place between 6:00 AM and 9:00 PM, <br />Monday through Saturday. Applicant shall be allowed to operate 24 hours <br />per day for a maximum of fourteen (14) days per calendar year. <br />6. The slopes surrounding the excavation area shall be graded or backfilled to <br />contour and shape the peaks and depressions thereof, so as to produce a <br />gently drained surface that will minimize erosion due to rainfall and which <br />will be in substantial conformity to the adjoining land area. <br />7. Four (4) inches of black topsoil shall be placed on all areas. <br />8. Vegetation shall be restored by appropriate seeds of grasses or planting of <br />shrubs or trees in all parts of said mining area. <br />9. The banks of all excavation not backfilled shall be sloped not steeper than <br />3:1 and said bank shall require the establishment of vegetation.
The URL can be used to link to this page
Your browser does not support the video tag.