My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Anderson Brothers Staff Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
03-19-2015 Planning Commission Meeting
>
Anderson Brothers Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:04:56 PM
Creation date
4/21/2016 2:04:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pequot Lakes Staff Report 4(a) - 1 <br />March 19, 2015 <br /> <br /> <br />PUBLIC HEARING <br /> <br />Application: Conditional Use Permit for an Extractive Use <br /> <br />Applicant: Anderson Brothers Construction <br /> <br />Agenda Item: 4 (a) <br /> <br />Background Information: The property in question is located in the <br />northeastern part of the City on Wild Acres Road and is currently zoned <br />Agriculture. The subject property is also within the Extractive Use Overlay <br />District. The parcel is approximately forty (40) acres in size and currently has no <br />structures on the property. <br /> <br /> <br /> <br /> <br />The applicant proposes the maximum excavation area will be approximately 12 <br />acres in size, with a 5 acre stockpile/processing area. The total amount of base <br />material to be extracted from the site will be approximately 500,000 tons of Class <br />V, Class I and Class VI materials. The applicant proposes to remove the material <br />through excavation, without using blasting or explosives. The processing of base <br />materials will involve the use of portable aggregate crushing, screening, feeder <br />and stacking equipment. Loaders, dozers and skid loaders will be used to extract <br />and move material to the processing equipment. <br /> <br />Applicant proposes to reclaim the pit area in two stages: Interim and Final <br />Restoration. The interim reclamation plan anticipates periods of dormancy <br />during the life of the mining operation. During these dormant periods, the <br />interim restoration goal is to stabilize and secure the site.
The URL can be used to link to this page
Your browser does not support the video tag.