My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Construction Phase Engineering Services Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
04-05-2016 Council Meeting
>
09.03 - Construction Phase Engineering Services Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 11:56:10 AM
Creation date
3/31/2016 11:56:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH SMITH NOLTING <br /> 2016 FEE SCHEDULE <br /> HOURLY CLASSIFICATION <br /> Engineer/Architect/Surveyor/Scientist/Wetland Specialist/Geograuher <br /> Level I $92.00 <br /> Level II $110.00 <br /> Level III $135.00 <br /> Level IV $145.00 <br /> Level V $160.00 <br /> Technician <br /> Level $60.00 <br /> Level II $74.00 <br /> Level III $90.00 <br /> Level IV $107.00 <br /> Level V $112.00 <br /> Computer Systems Specialist $120.00 <br /> Senior Funding Specialist $105.00 <br /> Marketing Specialist $95.00 <br /> Funding Specialist $80.00 <br /> Administrative Assistant $53.00 <br /> OTHER <br /> Mileage (Federal Standard Rate) subject to IRS Guide lines <br /> Meals/Lodging Cost <br /> Stakes&Expendable Materials Cost <br /> Waste Water Sampler $40.00/Day <br /> ISCO Flow Recorder $60.00/Day <br /> Photoionization Detection Meter $80.00/Day <br /> Explosimeter $50.00/Day <br /> Product Recovery Equipment $35.00/Day <br /> Survey-Grade GPS(Global Positioning System) $75.00/Hour <br /> Mapping GPS (Global Positioning System) $150.00/Day <br /> Soil Drilling Rig $35.00/Hour <br /> Groundwater Sampling Equipment $75.00/Day <br /> Subcontractors Cost Plus 10% <br /> All Accounts due and payable within 30 days of billing.A finance charge is computed on a periodic rate of 1% <br /> per month which is an annual percentage rate of 12%on any previous balance not .. . within 30 .. <br /> These rates are effective for only the year indicated and are subject to yearly adjustments which reflect <br /> components.equitable changes in the various <br />
The URL can be used to link to this page
Your browser does not support the video tag.