| ARTICLE 7. CLIENT'S RESPONSIBILITIES      					10. Provide'record"drawings and specifications for all existing physical features,
<br />     	A. To permit WSN to perform the services required hereunder,the CLIENT shall supply,in		structures,equipment,utilities,or facilities which are pertinent to the Project,to the
<br />       	proper time and sequence,the following at no expense to WSN:  				extent available.
<br />       	1.  Provide all program,budget,or other necessary information regarding its requirements 	11. Provide other services,materials,or data as may be set forth in the Letter
<br />   		as necessary for orderly progress of the work.   					Agreement or any Exhibits attached hereto.
<br />       	2.  Designate in writing,a person to act as CLIENT's representative with respect to the 	B. WSN may use any CLIENT provided information in performing its services. WSN shall be
<br />   		services to be rendered under this Agreement.Such person shall have authority to    	entitled to rely on the accuracy and completeness of information furnished by the
<br />   		transmit instructions,receive instructions,receive information,interpret and define     	CLIENT.If WSN finds that any information furnished by the CLIENT is in error or is
<br />   		CLIENT's policies with respect to WSN's services.    				inadequate for its purpose,WSN shall endeavor to notify the CLIENT. However,WSN
<br />     											shall not be held responsible:for any errors or omissions that may arise as a result of
<br />       	3.  Furnish,as required for performance of WSN's services(except to the extent provided  	erroneous or incomplete information provided by CLIENT.
<br />   		otherwise in the Letter Agreement or any Exhibits attached hereto),data prepared by or
<br />   		services of others,including without limitation,core borings,probes and subsurface
<br />   		explorations,hydrographic and geohydrologic surveys,laboratory tests and inspections      ARTICLE S.OPINIONS OF COST
<br />   		of samples,materials and equipment;appropriate professional interpretations of all of	Opinions of probable project cost,construction cost,financial evaluations,feasibility studies,
<br />   		the foregoing;environmental assessment and impact statements;property,boundary	economic analyses of alternate solutions and utilitarian considerations of operations and
<br />   		easement,right-0f--way,topographic and utility surveys;property descriptions;zoning,	maintenance costs provided for in the Letter Agreement or any Exhibits attached hereto are
<br />   		deed and other land use restriction;and other special data not covered in the Letter 	to be made on the basis of WSN's experience and qualifications and represent WSN's
<br />   		Agreement or any Exhibits attached hereto.       				judgment as an experienced design professional.It is recognized,however,that WSN does
<br />  											not have control over the cost of labor,material,equipment or services furnished by others or
<br />       	4.  Provide access to,and make all provisions for WSN to enter upon publicly or privately       over market conditions or contractors'methods of determining their prices,and that any
<br />   		owned property as required to perform the work.   				evaluation of any facility to be constructed,or acquired,or work to be performed on the basis
<br />  											of WSN's cost opinions must,of necessity,be speculative until completion of construction or
<br />       	5.  Act as liaison with other agencies or involved parties to carry out necessary       	acquisition.Accordingly,WSN does not guarantee that proposals,bids or actual costs will not
<br />   		coordination and negotiations;famish approvals and permits from all governmental  	substantially vary from opinions,evaluations or studies submitted by WSN to CLIENT
<br />   		authorities having jurisdiction over the Project and such approvals and consents from	hereunder.
<br />   		others as may be necessary for completion of the Project.
<br />       	6.  Examine all reports,sketches,drawings,specifications and other documents prepared       ARTICLE 9. CONSTRUCTION PHASE SERVICES
<br />   		and presented by WSN,obtain advice of an attorney,insurance counselor or others as       CLIENT acknowledges that it is customary for the architect or engineer who is responsible for
<br />   		CLIENT deems necessary for such examination and render in writing,decisions    	the preparation and furnishing of Drawings and Specifications and other construction-related
<br />   		pertaining thereto within a reasonable time so as not to delay the services of WSN.  	documents to be employed to provide professional services during the Bidding and
<br />  											Construction Phases of the Project,(1)to interpret and clarify the documentation so
<br />       	7.  Give prompt written notice to WSN whenever CLIENT observes or otherwise becomes       furnished and to modify the same as circumstances revealed during bidding and construction
<br />   		aware of any development that affects the scope of timing of WSN's services or any 	may dictate,(2)in connection with acceptance of substitute or equal items of materials and
<br />   		defect in the work of Construction Contractor(s),Consultants or WSN.   		equipment proposed by bidders and Contractor(s),(3)in connection with approval of shop
<br />  											drawings and sample submittals,and(4)as a result of and in response to WSN's detecting in
<br />       	8.  Initiate action,where appropriate,to identify and investigate the nature and extent of 	advance of performance of affected work inconsistencies or irregularities in such
<br />   		asbestos and/or pollution in the Project and to abate and/or remove the same as may	documentation.CLIENT agrees that if WSN is not employed to provide such professional
<br />   		be required by federal,state or local statute,ordinance,code,rule,or regulation now	services during the Bidding(if the work is put out for bids)and the Construction Phases of
<br />   		existing or hereinafter enacted or amended.For purposes of this Agreement,"pollution"      the Project,WSN will not be responsible for,and CLIENT shag indemnify and hold WSN,its
<br />   		and"pollutant"shall mean any solid,liquid,gaseous or thermal irritant or contaminant,       officers,consuttant(s),subcontractor(s),employees and agents harmless from,all claims,
<br />   		including smoke,vapor,soot,alkalis,chemicals and hazardous or toxic waste.     	damages,losses and expenses including attomeys'fees arising out of,or resulting from,any
<br />   		Hazardous or toxic waste means any substance,waste pollutant or contaminant now or      interpretation,clarification,substitution acceptance,shop drawing or sample approval or
<br />   		hereafter included within such terms under any federal,state or local statute.      	modification of such documentation issued or carded out by CLIENT or others.Nothing
<br />   		ordinance,code,rule or regulation now existing or hereinafter enacted or amended. 	contained in this paragraph shall be construed to release WSN,its officers,consultant(s),
<br />   		Waste further includes materials to be recycled,reconditioned or reclaimed.       	subcontractor(s),employees and agents from liability for failure to perform in accordance with
<br />  											professional standards any duty or responsibility which WSN has undertaken or assumed
<br />   		If WSN encounters,or reasonably suspects that it has encountered,asbestos or    	under this Agreement.
<br />   		pollution in the Project,WSN shall cease activity on the Project and promptly notify the
<br />   		CLIENT,who shall proceed as set forth above.Unless otherwise specifically provided
<br />   		in the Letter Agreement,the services to be provided by WSN do not include       	ARTICLE 10.REVIEW OF SHOP DRAWINGS AND SUBMITTALS
<br />   		identification of asbestos or pollution,and WSN has no duty to identify or attempt to 	WSN may review and approve or take other appropriate action on the contractor's submittals
<br />   		identify the same within the area of the Project.    				or shop drawings for the limited purpose of checking for general conformance with information
<br />  											given and design concept expressed in the Contract Documents. Review and/or approval of
<br />   		With respect to the foregoing,CLIENT acknowledges and agrees that WSN is not a 	submittals is not conducted for the purpose of determining accuracy and completeness of
<br />   		user,handler,generator,operator,treater,storer,transporter or disposer of asbestos or      other details or for substantiating instructions for installation or performance of equipment or
<br />   		pollution which may be encountered by WSN on the Project.It is further understood 	systems,all of which remain the exclusive responsibility of the contractor. WSN's review
<br />   		and agreed that services WSN will undertake for CLIENT may be uninsurable      	and/or approval shall not constitute approval of safety precautions,or any construction
<br />   		obligations involving the presence or potential presence of asbestos or pollution.    	means,methods,techniques,sequences or procedures. WSN's approval of a specific item
<br />   		Therefore,CLIENT agrees,except(1)such liability as may arise out of WSN's sole  	shall not indicate approval of an assembly of which the item is a component. WSN's review
<br />   		negligence in the performance of services under this Agreement or(2)to the extent of       and/or approval shall not relieve contractor for any deviations from the requirements of the
<br />   		insurance coverage available for the claim,to hold harmless,indemnify and defend  	contract documents nor from the responsibility for errors or omissions on items such as sizes,
<br />   		WSN and WSN's officers,subcontractor(s),employees and agents from and against 	dimensions,quantities,colors,or locations.Contractor shall remain solely responsible for
<br />   		any and all claims,lawsuits,damages,liability and costs,including,but not limited to,	compliance with any manufacturer requirements and recommendations.
<br />   		costs of defense,arising out of or in any way connected with the presence,discharge,
<br />   		release,or escape of asbestos or pollution.This indemnification is intended to apply
<br />   		only to existing conditions and not to conditions caused or created by WSN.This   	ARTICLE 11.REVIEW OF PAY APPLICATIONS
<br />   		indemnification shall survive the termination of this Agreement. 			If included in the scope of services,any review or certification of any pay applications,or
<br />   											certificates of completion shall be based upon WSN's observation of the Work and on the
<br />       	9.  Provide such accounting,independent cost estimating and insurance counseling    	data comprising the contractors application for payment,and shall indicate that to the best of
<br />   		services as may be required for the Project,such legal services as CLIENT may require      WSN's knowledge,information and belief,the quantity and quality of the Work is in general
<br />   		or WSN may reasonably request with regard to legal issues pertaining to the Project 	conformance with the Contract Documents. The issuance of a certificate for payment or
<br />   		including any that may be raised by Contractor(s),such auditing service as CLIENT 	substantial completion is not a representation that WSN has made exhaustive or continuous
<br />   		may require to ascertain how or for what purpose any Contractor has used the moneys       inspections,reviewed construction means and methods,verified any back-up data provided
<br />   		paid under the construction contract,and such inspection services as CLIENT may  	by the contractor,or ascertained how or for what purpose the contractor has used money
<br />   		require to ascertain that Contractor(s)are complying with any law,rule,regulation,  	previously paid by CLIENT.
<br />   		ordinance,code or order applicable to their furnishing and performing the work.
<br /> |