My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-02-2016 City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Minutes
>
2016
>
02-02-2016 City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 1:01:33 PM
Creation date
3/7/2016 1:01:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> February 2, 2016 <br /> Page 7 of 12 <br /> ----------------------------- <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br /> 18.Per the Design-Build Contract, Mathiowetz shall immediately (less than <br /> 12 hours) remove any and all road kill and debris from the roadway. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br /> 19.Per the Design-Build Contract, Mathiowetz is responsible for routine <br /> maintenance within the Project Limits and on all temporary facilities. <br /> The County and City understand that this would require Mathiowetz to <br /> have a sweeper/ pick-up broom available on-site to sweep the <br /> roadway. The County will address any non-routine maintenance <br /> activities (Book 2, Section 19.4.1) that Mathiowetz is not responsible <br /> for. <br /> 20.Per the Design-Build Contract (Book 2, Section 19.4.2.1.1), MnDOT, <br /> the County, and cities are responsible for snow and ice removal. Due <br /> to the increased length and temporary re-routing of CSAH 11 — <br /> besides the existing CSAH 11 blocked off by construction —the City <br /> and County will have to work out a plan for snow and ice removal on <br /> the existing CSAH 11 west of the interchange construction. <br /> 21.The City is conducting a construction project at the wastewater <br /> treatment facility in 2016 with construction access anticipated on <br /> Derksen Road. Mathiowetz shall provide for unimpeded access for the <br /> City's construction contractor. <br /> 22.Per the Design-Build Contract, Mathiowetz shall restore any damage to <br /> infrastructure (e.g. curb and gutter) due to damage caused by traffic <br /> during the temporary re-route period. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br /> 23.Per the Design-Build Contract, Mathiowetz shall restore all <br /> infrastructure (e.g. pavement striping and signage) to pre-temporary <br /> re-route conditions. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br />
The URL can be used to link to this page
Your browser does not support the video tag.