My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-05-2016 City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Minutes
>
2016
>
01-05-2016 City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 3:45:39 PM
Creation date
2/5/2016 3:45:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> January 5, 2016 <br /> Page 4 of 9 <br /> ----------------------------- <br /> Mayor Sjoblad noted that the City Council is considering two options for a <br /> traffic detour of CSAH 11 during the Highway 371 expansion project. He <br /> asked if there was anyone present who wanted to make a public <br /> comment. No further public comments were made. <br /> Tim Houle informed the Council that a group consisting of Mayor Sjoblad, <br /> Council Member Loukota, Nancy Malecha, Mike Loven, and himself met <br /> last week to discuss 26 proposed conditions for Council consideration. <br /> These conditions were drafted for Mathiowetz Construction to address on <br /> an ongoing basis during the CSAH 11 traffic detour. Mr. Houle then met <br /> with representatives from Mathiowetz Construction on the proposed <br /> conditions and the following are areas of their concern. <br /> • #2 —This condition addresses very minimal construction equipment <br /> crossing of the re-routed CSAH 11. Brad Ommodt from Mathiowetz <br /> Construction noted that limiting the crossings to five a day would <br /> not be feasible. <br /> • #5 —This condition addresses the duration of the temporary re- <br /> route from mid-May until November 1St. Mr. Ommodt stated that <br /> pushing up the timeline from November 30th to November 1St would <br /> be difficult for Mathiowetz Construction to meet. <br /> • #6 —This condition addresses accommodating walkers and bikers <br /> on the Paul Bunyan Scenic Byway. Mr. Ommodt noted that <br /> MnDOT's requirements for this project are that they only have to <br /> handle vehicular traffic. He further noted that this is something <br /> Mathiowetz Construction would have to work with the County on for <br /> possible closure of the Byway during the project. <br /> • #10 & 11 —These conditions address the wording and coordination <br /> of signage. Mr. Ommodt stated that Mathiowetz Construction <br /> would prefer that the City determine the signage wording and <br /> events. <br /> • #13 —This condition addresses the bituminous base at the <br /> beginning and end of the re-route timeline. Mr. Ommodt noted his <br /> concern of laying only two inches of bituminous at the beginning of <br /> the re-route timeline and its ability to handle the high traffic volume. <br /> He stated that Mathiowetz Construction would like to lay four inches <br /> of bituminous at the beginning of the re-route timeline to deter <br /> future traffic problems causing the re-route to be shut down. Mr. <br /> Ommodt further noted that the construction contract does have a <br /> two year warranty. <br /> • #16 & 17 —These conditions address the notifications and <br /> meetings of information as the project progresses. It was noted <br /> that MnDOT would take the lead on these notifications. <br /> • #18 & 20 —These conditions address maintenance items on <br /> removal of road kill, debris, and snow. Mr. Ommodt noted that <br />
The URL can be used to link to this page
Your browser does not support the video tag.