My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - CSAH 11 Temporary Route Conditions
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
02-02-2016 Council Meeting
>
09.01 - CSAH 11 Temporary Route Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 2:48:39 PM
Creation date
1/28/2016 2:48:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
will conduct weekly meetings that the public can attend, ask questions <br /> and express concerns, get answers, and obtain information. Other <br /> communication approaches in lieu of weekly meetings will be <br /> considered. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br /> 18)Per the Design-Build Contract, Mathiowetz shall immediately (less than <br /> 12 hours) remove any and all road kill and debris from the roadway. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br /> 19)Per the Design-Build Contract, Mathiowetz is responsible for routine <br /> maintenance within the Project Limits and on all temporary facilities. <br /> The County and City understand that this would require Mathiowetz to <br /> have a sweeper/pick-up broom available on-site to sweep the roadway. <br /> The County will address any non-routine maintenance activities (Book 2, <br /> Section 19.4.1) that Mathiowetz is not responsible for. <br /> 20)Per the Design-Build Contract (Book 2, Section 19.4.2.1.1), MnDOT, the <br /> County, and cities are responsible for snow and ice removal. Due to the <br /> increased length and temporary re-routing of CSAH 11 —besides the <br /> existing CSAH 11 blocked off by construction—the City and County will <br /> have to work out a plan for snow and ice removal on the existing CSAH <br /> 11 west of the interchange construction. <br /> 21)The City is conducting a construction project at the wastewater treatment <br /> facility in 2016 with construction access anticipated on Derksen Road. <br /> Mathiowetz shall provide for unimpeded access for the City's <br /> construction contractor. <br /> 22)Per the Design-Build Contract, Mathiowetz shall restore any damage to <br /> infrastructure (e.g. curb and gutter) due to damage caused by traffic <br /> during the temporary re-route period. <br /> As this requirement is already in the Design-Build Contract, this <br /> condition will get deleted from the final version. <br />
The URL can be used to link to this page
Your browser does not support the video tag.