My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - MnDOT Highway 371 Design-Build Team Selection
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
11-03-2015 Council Meeting
>
09.03 - MnDOT Highway 371 Design-Build Team Selection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2015 3:02:22 PM
Creation date
10/29/2015 3:02:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> AGENDA ITEM #9.3 <br /> Pe not <br /> La�l�es <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: November 3, 2015 <br /> Subject: MnDOT Highway 371 Design-Build Team <br /> Selection <br /> Report: In an email from MnDOT's Jim Hallgren to <br /> several cities along Highway 371, he let us know that the <br /> apparent best value bidder for the new 4-lane Highway 371 <br /> Design-Build (DB) project is Mathiowetz Construction. <br /> MnDOT needs to use the term `apparent' because <br /> throughout this next month, there are various contractual <br /> matters that need to be accomplished before Mathiowetz <br /> Construction is officially the awarded DB Contractor. <br /> MnDOT says the overall schedule is still to have the DB <br /> contractor complete various clearing and grubbing <br /> operations this winter before beginning roadway <br /> construction in the spring of 2016. Completion is <br /> tentatively still set for the end of 2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.