Laserfiche WebLink
EXHIBIT A <br />PROPOSED DESCRIPTION <br />LAND SALE <br />STATE OF MINNESOTA <br />TO <br />CITY OF PEQUOT LAKES <br />LAND SALE # 18166 <br />That part of the westerly 150 feet of the former Burlington Northern Railroad Company 250 foot <br />wide State Ground property at Pequot Lakes, Minnesota, located on the Brainerd to Bemidji <br />Branch Line right-of-way (now Paul Bunyan State Trail) located within the Northeast Quarter of <br />the Northeast Quarter Section 15 and the Southeast Quarter of the Southeast Quarter Section 10, <br />all in Township136 North, Range 29 West, Crow Wing County, Minnesota, lying northerly of <br />the westerly extension of the southerly right-of-way line of Main Street as laid out and dedicated <br />in COLE' S PLAT OF PEQUOT, lying southerly of the westerly extension of the northerly right- <br />of-way line of East Sibley Street as laid out and dedicated in COLE'S PLAT OF PEQUOT, and <br />lying westerly of a line drawn parallel with and distant �-17.5 feet westerly of the centerline of <br />said Paul Bunyan State Trail. <br />AND <br />That part of the easterly 100 feet of the former Burlington Northern Railroad Company 250 foot <br />wide State Ground property at Pequot Lakes, Minnesota, located on the Brainerd to Bemidji <br />Branch Line right-of-way (now Paul Bunyan State Trail) located within the Northeast Quarter of <br />the Northeast Quarter Section 15 and the Southeast Quarter of the Southeast Quarter Section 10, <br />all in Township136 North, Range 29 West, Crow Wing County, Minnesota, lying southerly of <br />the westerly extension of the northerly right-of-way line of East Sibley Street as laid out and <br />dedicated in COLE' S PLAT OF PEQUOT, lying northerly of a line drawn parallel with and <br />distant 700.0 feet southerly from the north line of said Northeast Quarter of the Northeast <br />Quarter, and lying easterly of a line drawn parallel with and distant �17.5 feet easterly of the <br />centerline of said Paul Bunyan State Trail. <br />Written by DNR Lands and Minerals Surveyor: Joe Fleisher October 26, 2012 <br />Revised bv DNR Lands and Minerals Supervisor: Jodi M. Dehn April 5, 2013 after discussions <br />with Mavor Nancv Adams and DNR Trails Subervisor, Wade Miller. <br />