Laserfiche WebLink
lir MINNESOTA Proposed Pequot Lakes Bypass <br /> Highway 371 <br /> 3 71 Looking ow <br /> North Toward • r <br /> Pequot North T Lakes <br /> > CSAH 11 <br /> Rehab and- <br /> ''-- 1- S treetscaping <br /> . ,, .. its. <br /> . <br /> 1.I^ 'i <br /> .., ` _ �:.. Interchange <br /> /� <br /> 3. _` <br /> \ -:V V .� <br /> _.. <br /> -g.: _ , oroncncv4 0/e NSA <br /> ]pedc'wy]]1i <br /> �1 <br /> 4:1P , <br /> ' . /dam. <br /> • t• N <br /> - - g / ( <br /> �- , <br /> Project Costs (2009$) *Includes 5M for Interchange at CSAH 11 Funding **2.5M for Interchange at CSAH 11 Cass <br /> Description Final ROW Const Total Mn/DOT C County County Cities <br /> Design Y <br /> Stage 1 -Nisswa to $6.0M $15.3M $55.0M $76.3M* $72.2M $3.5M** $0.6M <br /> Jenkins(9 miles) <br /> Stage 2-Jenkins to Pine $3.OM $9.7M $30.OM $42.7M $41.8M $0.6M $0.3M <br /> River(7 miles) <br /> Local Infrastructure $0.5M $0.5M $6.OM $7.OM $0.5 $6.5M <br /> Enhancements*** <br /> Totals $9.5M $25.5M $91.0M $126.0M $114.0M $4.OM $0.6M $7.4M <br /> ***Local road rehabilitation,streetscaping,utilities etc.-See separate sheet for details. <br /> Federal Funds Needed = $100.8 Million (80% of Total Cost) <br /> Schedule: Mn/DOT has delayed the project due to lack of funding. Stage 1 is now programmed for 2018 and <br /> Stage 2 for 2029. This is simply too long to wait. This delay will have a detrimental effect on the local economy and risk <br /> to travelers will increase significantly. Construction costs alone will grow to $170 Million. The project can be delivered <br /> much sooner. If federal funds are awarded to the project in FY 2010 the following schedule can be achieved: <br /> Task Name Start Finish 2009 2010 2011 2012 2013 2014 ` ..� •CROW-WING <br /> JanApr Jul OctJanApr Jul OctJanApr Jul OctJanApr Jul OctJanApr Jul OctJanApr Jule. el: COUNTY <br /> Stage 1 (Nisswa to Jenkins) 717/09 3/5/12 pine River 2 <br /> Municipal Consent Pequot Lakes 7/7109 709 ® y� STAGE 2 <br /> 17/ <br /> Municipal Consent Nisswa 9/8106 s 6ro9 �* Wil <br /> Can P 119 �. <br /> Municipal Consent Jenkins 11/10/09 11/10/09 • ig, <br /> New In 1W <br /> Final Design 11/20/09 1 1/2/1 1 Jenkins N <br /> �' Right of Way Acquistion 3/26/10 11/6/11 C k o <br /> Start Construction 3/5/12 3/5/12 • <br /> s'1J <br /> Stage 2 (Jenkins to Pine River)10/5/10 3/5/14 f®PequetLakes <br /> Municipal Consent Jenkins 10/5/1 0 10/5/10 • STAGE 1 <br /> nn s IA <br /> Municipal Consent Pine River 10/5/10 10/5/10 • 11 () '� <br /> Art s In <br /> Final Design 1/2/12 12114/13 <br /> Right of Way Acquistion 5/3/12 12/14/13 i CASS ti! <br /> 9 Y q COUNTY Nisswa <br /> Start Construction 3/5/14 3/5/14 * t., <br /> Mr 5'14 <br />