My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Federal Funding Request
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
04-14-2009 Special Council Meeting
>
Federal Funding Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 8:09:21 AM
Creation date
7/28/2015 8:09:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It-MINNESOTA The Highway 371 Project <br /> 371 Partnership is a collaboration between the <br /> cities of Nisswa, Pequot Lakes, Jenkins, Pine <br /> = i_.= %'•__ River, the counties of Cass and Crow Wing to ad- <br /> _1=.__i _ 7 --. vocate upgrading Highway 371 to a 4-lane ex- <br /> _ 1 1 -.7 - pressway design and enhance local road connec- <br /> �^1 r.-.r.�. tions and infrastructure. <br /> -'-7--1--I - 1 ! <br /> 1 M 1—1 f---.-1 Pmm Lnwtinn <br /> ;_.__ 1--T-1 .r The project will continue major investment already <br /> _ !.1 i•--1 �•-.-• made on the highway corridor from its source at <br /> --1-.-•-1 -1 4--1-1-1 - Highway 10 in the City of Little Falls to the City of <br /> 1 1 ^- Hr <br /> _`-1 _ _ _ 1 Nisswa. <br /> -\-i__!_rrTj"-- Moving Forward.. <br /> _� k. _ r--i^1.-� <br /> L T-1,..,f '- <br /> �7; 7;`1-_`,,'-'-r_?ter= _ Improvements completed include 27 miles of 4- <br /> .j _ i.—r_-r -11-._. I-i- 1_ lane expressway between Little Falls and Baxter <br /> - i - 1 - ; _ ;- 0 with a bypass of Brainerd and a new Mississippi <br /> River crossing, a new Welcome Center and Rest <br /> Area, grade separated interchanges at CSAH 46, <br /> -ri CSAH 47, and Business 371. Access manage- <br /> Pine River• ment improvements have been completed between <br /> Baxter and Nisswa including several intersections <br /> S Jenkins upgrades and new service roads each side of the <br /> Construct four-lane li <br /> Nisswa to Pine River highway. — <br /> Pequot Lakes( The Highway 371 Project Partnership is committed <br /> to moving forward the 4-lane expressway design <br /> •Nisswa from Nisswa to Pine River as soon as possible and <br /> achieving the project's safety, mobility, recreational <br /> Access management and economic goals. The project's environmental <br /> Nisswa to Baxter study is complete and design is well underway. <br /> Construction can begin in 2012 if funding is se- <br /> Brainerd <br /> Baxter cured. The project is estimated to create <br /> • • r. <br /> 210 more than 2600 jobs for this region. <br /> Brainerd Bypass <br /> \4' Built <br /> �QQ\Q ® .interchange Background Information <br /> 4' Corridor Built 9 Highway 371 is a Medium Priority Interregional <br /> Corridor connecting the Central Minnesota Lakes <br /> ® Welcome <br /> A rea Center <br /> & Rest Area to the Twin Cities. It is a critical link to tour- <br /> Built ism and the economic vitality of the Lakes Area <br /> Four-lane and is the busiest north-south commuter route to <br /> Expressway the cities of Brainerd and Baxter. The corridor par- <br /> 115 Built allels the Paul Bunyan Trail for much of its length <br /> ili which provides multi-use recreation to thousands of <br /> users. Growing traffic demand has severely con- <br /> 1 271 • Little Falls strained the capacity and safety of the highway and <br /> N has increased the pressure and risk to all road sys- <br /> �o N tems in the region. <br />
The URL can be used to link to this page
Your browser does not support the video tag.