My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.01 - December 3, 2013 City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2014
>
01-07-2014 Council Meeting
>
03.01 - December 3, 2013 City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2015 10:10:56 AM
Creation date
7/13/2015 10:10:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> December 3, 2013 <br /> Page 6 of 10 <br /> 8.2. Hart Service Contract <br /> COUNCIL MEMBER AKERSON MOVED TO RENEW THE SERVICE <br /> CONTRACT WITH H.A.R.T. FOR 2014. COUNCIL MEMBER <br /> PEDERSON SECONDED THE MOTION. MOTION CARRIED 4-0. <br /> 9. Public Works <br /> 9.1. City Engineer Verbal Update <br /> City Engineer Tim Houle gave the following reports. <br /> North Washington Avenue <br /> A committee of Council Member Sjoblad, Council Member Gardner, Mike <br /> Loven and Tim Houle met to discuss aesthetics. Many possible <br /> enhancements were discussed including decorative street lights, banners, <br /> flower baskets, art, kiosks, retaining waits, planter urns, benches, bike <br /> racks, trash receptacles, sidewalk pavers, stamped and/or colored <br /> concrete sidewalks, architecturally scored sidewalks, text in sidewalks, <br /> water features, and crosswalks. <br /> The committee's thought was to look at decorative street lights more so <br /> along the CSAH 11 / Main Street corridor than north and south on <br /> Washington. However, the CSAH 11 / Main Street corridor would have to <br /> be worked on so that we could pick something appropriate for the south <br /> end of this project. We could possibly guess and at least put in <br /> underground conduit for the future. Part of any decorative pole is to <br /> determine what, if any, banners, hanging flower baskets, or decorations <br /> will be placed on the poles. <br /> The committee looked at water features in the bump outs. Because they <br /> require electrical and need proper sloping and drainage, and considering <br /> the amount of time each year they would be available, the Committee did <br /> not wanto look into it further. <br /> The committee discussed different alternatives on art, kiosks, planter urns, <br /> benches, bike racks, and trash receptacles in the bump outs. The <br /> committee recommends using quality materials and good coatings that <br /> would last for the long-term. Having a unifying look is important. The <br /> Committee decided that if private property owners want some of these <br /> features, they could purchase them from the City. The City would provide <br /> them (going back to that unifying look) and install them in the R/W. <br /> Council Member Pederson stated that if the property owners would not <br /> provide the amenities, it would be important for the City to cover the costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.