My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.02 - Comprehensive Plan Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
02-08-2012 Council Meeting
>
06.02 - Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 2:34:42 PM
Creation date
12/3/2013 1:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
development scenario. It is not equitable for current businesses to be taxed to pay for a utility <br />extension to the edge of town. <br />If the Council wishes to plan for strip commercial development along the corridor, guidance should be <br />given to the Planning Commission. <br />2. Park plan does not address a ball park <br />"Ball fields" are mentioned on page 13 as a community asset and "baseball" is listed as an "opportunity" <br />in Appendix A. The Comprehensive Plan does not mention the need for additional ballfields. <br />In all of the public meetings that were held on the Comprehensive Plan and all of the public input that <br />was received, nobody mentioned a need for an additional ball park. There was a discussion on <br />potentially coordinating with the school district on additional ballparks, but no language was added to <br />the document. <br />It is relatively easy to add a strategy that would have the City Parks Committee make this a priority. If <br />this will resolve Councilor Ryan's concern, the Planning Commission will make this amendment. <br />3. Same action items in multiple locations <br />Various action items were intentionally included in multiple sections of the Comprehensive Plan because <br />many of the strategies being adopted are meant to address multiple goals and objectives. Maximizing <br />the value of the City's actions is one of the primary functions of a good Comprehensive Plan. <br />For example, coordinating park initiatives throughout the downtown is a strategy that meets <br />Community Character goals, Economic Development goals and Recreational goals at the same time. <br />4. Americans love autos -we can't change that mentality, social engineering <br />The automobile is currently the most popular mode of transportation in Pequot Lakes, as it is in many <br />cities throughout the country. The Comprehensive Plan, as currently written, does not call for less <br />automobile travel. <br />The plan does call for a recalibration of the city's efforts within the downtown and the surrounding <br />neighborhoods. It is important to understand that slower moving traffic does not reduce the ability to <br />drive but enhances the ability of people to walk. Narrowing the streets within the City would reduce the <br />speed of traffic and increase the safety of pedestrians. The city has a desperate need to improve the <br />value and quality of these places, as well as their overall economic health. Looking at the situation <br />dispassionately, these areas have the greatest level of public commitment for maintaining infrastructure <br />(streets, sidewalks, curb and gutter, sanitary sewer, water) and some of the most significant private <br />sector investment in commercial properties, yet the tax base is minimal, especially in the surrounding <br />neighborhoods. This is not financially viable over the long run. <br />As part of the planning process, the Planning Commission identified a need to do two — somewhat <br />contradictory -- things simultaneously. First, there is a need to lower the long -term costs associated with <br />WWW.COMMUNITYGROWTH.COM WWW.STRONGTOWNS.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.