My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Exhibit 8 - Draft Final Sewer Ordinance
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
03-05-2013 Council Meeting
>
09.03 - Exhibit 8 - Draft Final Sewer Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2013 3:40:29 PM
Creation date
11/27/2013 2:41:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(3) Change by Ordinance: Any change in the City sewer <br />availability charge amount, as hereinafter set forth shall be <br />by Ordinance Amendment. <br />B. Determination of Charge. The amount of the availability charge <br />shall be determined by the City by first determining the number of <br />Equivalent Residential Connections (ERC's) applicable to t# <br />1' <br />particular property. The number of ERC's shall be calculated <br />accordance with the Sewer Availability Charge (SAC) Pr <br />Manual (using the most current edition) from the Endo t <br />Services division of the Metropolitan Council (locateir t. <br />The number of ERC's shall equal the number of s from <br />r <br />this document. All residential units are I ERC or ex ept for <br />apartments with a minimum of 4 units. F rtm Tl is with a <br />minimum of 4 units, with no plu d idual laundry <br />facilities in any of the units, each u is .8 ERC, or 0.8 <br />SAC. For various non - residential s o establishments, this <br />document includes an Appendix A: S teria for Commercial <br />Properties. Once the appropriate umber of ERC's are determined <br />in this manner, the av ilability appropriate <br />shall be calculated using the <br />most recent ordinanceblishing the availability charge. <br />C. Determination ofC�fltr City shall determine the number of <br />ERC's. _ � ]► <br />D. Tra eT C's�Once established, the number of ERC's shall <br />r m the n the property. An ERC can be transferred on the <br />ee fro a structure being removed to a structure being <br />Uses` in the Reference Document. Any use not represented in <br />above SAC Reference Document shall be subject to <br />determination of the appropriate number of ERC's by the City <br />based on estimated flows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.