Laserfiche WebLink
(2) To pay the certified delinquent amount after the hearing <br />date, but before the county certification deadline, with <br />interest at the rate set in the adopted rate schedule, accrued <br />beginning on eleventh day following the hearing date <br />through the date of payment. <br />(3) To pay the certified charges as billed to them by Crow <br />Wing County on their property tax statement with a <br />collection term of one year. <br />E. After the hearing, the certified roll, minus any payments, shall be <br />delivered to Crow Wing County. <br />4. In addition to any procedures or penalties provided by this ordinance, if <br />any person, firm or corporation fails to comply with any provision of this <br />ordinance, the council or any city official designated by it may institute <br />appropriate proceedings at law or at equity to procure payment and or enforce the <br />provisions of this ordinance. <br />Section 15 -2.9. INSTALLATION AND CONSTRUCTION REOUIREMENTS <br />AND SPECIFICATIONS <br />1. Supervision. All work performed within the limits of the City shall <br />comply with all requirements of the Minnesota Plumbing Code as amended and <br />the Ten States Standards and shall be under the direct supervision of the Public <br />Works Supervisor. <br />2. Authoritv to Do Work. Only persons authorized by this Chapter shall tap <br />any distributing main or pipe of the water system, or insert stopcocks or ferrule <br />therein. <br />3. Excavations. If the installation is to be in a surfaced street, the location of <br />the water main shall be ascertained from the City Engineer and, upon completion, <br />such installation shall be inspected by the Public Works Department. Prior to <br />construction within the street, notice shall be given to the Roads and Streets <br />Manager, School District, United States Post Office, Police and Fire Departments, <br />the County and/or State Highway Department, and City Public Works Director. <br />Such notice must be given at least (3) days prior to the excavation for laying of <br />the service pipe, and the connection must be made before three o'clock (3:00) <br />P.M. After approval by the Roads and Streets Manager, the street shall be restored <br />to its previously existing condition as directed and approved by the Public Works <br />Department. The expense of such construction and restoration shall be borne by <br />the applicant. <br />4. Separate Connections and Meters. No more than one housing unit or <br />building shall be supplied from one service connection except by special <br />