Laserfiche WebLink
Page 1 of 2 <br />Sandy Peine <br />From: Tim Houle [Tim. M. Houle @wsn.us.com] <br />Sent: Friday, January 25, 2013 4:58 PM <br />To: Sandy Peine <br />Cc: Mike Loven; Mike Rude <br />Subject: Pequot Lakes - WAC & SAC from other cities <br />Sandy, <br />On the above Subject, we did some file searching (when we are City Engineers), phone <br />calling, emailing, and webpage searching. From a combination of these (each with <br />varying levels of current updates), following is what we found out: <br />Wastewater <br />Baxter = Residential SAC = $3,000 per ERC; Commercial SAC = $3,400 per ERC <br />Brainerd = SAC = $1,900 per ERC <br />Breezy Point = SAC = $3,250 per ERC <br />Crosby = sewer tapping fee = $500 (not sure if this is per ERC) <br />Deerwood = hookup fee = $400 (not sure if this is per ERC) <br />Nisswa = SAC = $7,100 per ERC <br />Pillager = SAC = $1,000 per ERC <br />Pine River: Residential SAC = $1,600; Commercial and Industrial SAC = $3,400 <br />(believe these are per ERC) <br />Water <br />Baxter = Residential WAC = $2,800 per ERC; Commercial WAC = $3,100 per ERC <br />Brainerd = WAC = $1,400 per ERC <br />Breezy Point = no water system <br />Crosby = water tapping fee = $500 (not sure if this is per ERC) <br />Deerwood = hookup fee = $600 (not sure if this is per ERC) <br />Nisswa = no water system <br />Pillager = WAC = $1,000 per ERC <br />Pine River = fee is $250 + either $2,000 for water or sewer connection in black top; <br />$3,000 for water and sewer connection in black top; $700 for water or sewer connection <br />in gravel; or $1,200 for water and sewer connection in gravel (not sure if these are per <br />ERC) <br />Sandy, I believe Pequot Lakes' present amounts are as follows (although I am still not <br />clear if it is per ERC or not): <br />SAC = $8,000 <br />WAC = $2,200 <br />Our previous calculations had two options: use full system capacity or use remaining <br />system capacity. The proposed amounts worked out as follows: <br />SAC full system capacity = $3,090 per ERC <br />SAC remaining capacity = $6,310 per ERC <br />WAC full system capacity = $1,890 per ERC <br />WAC remaining capacity = $2,900 per ERC <br />1/28/2013 <br />