My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 - Bridge Designs
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
06-16-2015 Special Council Meeting
>
04 - Bridge Designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 2:49:25 PM
Creation date
6/11/2015 2:40:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
]A'-0" <br /> TRAIL <br /> l <br /> TRAIL <br /> C� <br /> FIELDSTONE COCRETE <br /> N <br /> I A <br /> TEK TUBE TO MATCH <br /> F i <br /> STONE IN LOCAL AREA } <br /> L <br /> L l A. <br /> Paul dunyan Tral <br /> --- ------ --SMOOTH FINISH <br /> BLOCK PATTERN <br /> COLORv MNDOT GRAY <br /> ELEVATION VIEW A-A DETAIL 1 ELEVATION VIEW B-B <br /> PIER ELEVATION STEEL SIGN 6 RAILING EMBLEM ABUTMENT FACE <br /> 01 RAILING EMBLEM 10 MATCH OTHER <br /> BRIOGES ALONG THE PAUL BUNYAN <br /> TRAII OR DFSIGN BY CITY <br /> A <br /> BLACK RAILING COLOR TO MATCH NEW LIGHTING AND / <br /> BENCHES LOCATED ON WASHINGTON AVENUE <br /> B <br /> WEST DETAIL 1 E. EAST <br /> ELEVATION ELEVATION <br /> •� -�B <br /> some <br /> I I <br /> 16'-0" 12'-0" I 12'-0" 4'-0" 10'-0" <br /> SHOULDER THRU THRU SHOULDER p' SHOULDER THRU THRU SHOULDER <br /> E T.H.371 S.B. I-E T.H.371 N.B. <br /> SOUTH ELEVATION <br /> DRAWING IS BASED ON DESIGN INFORMATION AVAILABLE JUNE 2015 AND MAY NOT NECESSARILY REPRESENT THE FINAL APPEARANCE. I AESTHETIC CONCEPT 2 (DR' M.A.S. ICHK: BRIDGF NO <br /> STATE PROJECT NO 1810-92 I SHEET NO. 4 OF 4 SHEETS I 18002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.