My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.01 - City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
06-02-2015 Council Meeting
>
03.01 - City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 8:25:44 AM
Creation date
5/28/2015 8:25:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> May 5, 2015 <br /> Page 5 of 9 <br /> Mike Loven stated that he has received quotes from Tri-City Paving for <br /> $85,913 and from Anderson Brothers for $83,549.11 for the following road <br /> improvement projects: <br /> 1. A complete re-construction of the portion of Pequot Blvd. between <br /> West Grove Street & West Sibley Street, along with two parking areas on <br /> the west side of Sibley Lake Park. <br /> 2. A bituminous overlay of Brown Street from South Oak Street to <br /> Honeysuckle Street. <br /> 3. A bituminous overlay of West Grove Street from Hwy. 371 west to <br /> Sibley Lake-Park. <br /> 4. A bituminous overlay of the entire block of South Heath Street. <br /> 5. A bituminous overlay of North Heath Street from Brown Street to <br /> West Sibley Street. <br /> Mike Loven explained that because Anderson Brothers was the low quote, <br /> he requested another quote for additional shouldering work with top-soil & <br /> seeding for$10,232.11. <br /> COUNCIL MEMBER LOUKOTA MOVED TO ACCEPT THE QUOTE <br /> FROM ANDERSON BROTHERS FOR $93,781.60 TO COMPLETE THE <br /> ROAD PROJECTS LISTED ABOVE. COUNCIL MEMBER AKERSON <br /> SECONDED THE MOTION. MOTION CARRIED 5-0. <br /> 9.2. Request for Engineering Proposal for Improvements to Pequot Boulevard <br /> Mike Loven requested approval for an engineering proposal from WSN to <br /> look at design and estimated costs for an upgrade of Pequot Boulevard <br /> from West Lake Street to Ramsey Street. <br /> COUNCIL MEMBER LOUKOTA MOVED TO AUTHORIZE WSN TO <br /> DRAFT A PROPOSAL FOR THE UPGRADE OF PEQUOT <br /> BOULEVARD FROM WEST LAKE STREET TO RAMSEY STREET. <br /> MAYOR SJOBLAD SECONDED THE MOTION. MOTION CARRIED 5-0. <br /> 9.3. Request to Petition for Improvements to North Sluetter Road <br /> Tim Houle, City Engineer, stated that Maurey Graham has requested the <br /> City to provide him with the petition form for local improvement to North <br />
The URL can be used to link to this page
Your browser does not support the video tag.