Laserfiche WebLink
Anderson Brothers would complete. As it appears the <br /> project is over $100,000, plans and specifications would <br /> need to be prepared and it would have to be publically bid. <br /> There would be other costs associated with this project, <br /> including but not limited to: <br /> • Hiring an appraiser to prove benefit to the properties <br /> • Engineer design costs <br /> • Engineer construction phase services <br /> • Special assessment process cost <br /> As a reminder, North Sluetter Road is not listed on the <br /> Capital Improvement Plan. <br /> If Mr. Graham acquires signatures of owners of at least <br /> 35% in frontage of property bordering the project, the City <br /> could begin the Minnesota Statute 429 (assessment) <br /> process (however, the City is not required to automatically <br /> keep moving forward). <br /> Since half of the footage (the Loon Lake Township side) is <br /> outside the City, Mr. Graham may want to obtain at least <br /> 70% of the footage on the City side (35% of the total <br /> footage of both sides). <br /> Through the assessment process, the City must prove <br /> benefit to the property owners by the amount of the <br /> assessment against each property. <br /> With one half of the road being owned by Loon Lake <br /> Township, the amount of dollars that would be assessed to <br />