My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.2 NW, Front and Main Street Updates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2024
>
03-04-2024
>
9.2 NW, Front and Main Street Updates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 8:24:44 AM
Creation date
3/29/2024 8:18:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEER'S ESTIMATE <br />S Corner of NW Area <br />PEQUOT LAKES, MN <br />February, 2024 <br />ITEM NO. ITEM DESCRIPTION UNIT ESTIMATED PRICE ESTIMATED QUANTITY TOTAL COST <br />1 ROADWAY LIN FIT 350.00$ 5350 1,872,500.00$ <br />2 WATERMAIN LIN FIT 200.00$ 5350 1,070,000.00$ <br />3 SANITARY SEWER LIN FT 350.00$ 6800 2,380,000.00$ <br />4 LIFT STATIONS EACH 500,000.00$ 2 1,000,000.00$ <br />5 STORM SEWER LIN FT 250.00$ 5000 1,250,000.00$ <br />6 STORM PONDS EACH 250,000.00$ 1 250,000.00$ <br />SUBTOTAL 7,822,500.00$ <br />ESTIMATED CONSTRUCTION COST: 7,822,500.00$ <br />CONTINGENCIES (15%) 1,173,000.00$ <br />SUBTOTAL: 8,996,000.00$ <br />ENGINEERING (15%): 1,349,000.00$ <br />LEGAL AND OTHER COSTS (2%): 180,000.00$ <br />ADMINISTRATION (2%): 180,000.00$ <br />ESTIMATED TOTAL PROJECT COST:10,705,000.00$ <br />DRAFT 2024-03-04
The URL can be used to link to this page
Your browser does not support the video tag.