My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.4 NW Front.Main Street Study Updates.2
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2024
>
02-05-2024
>
9.4 NW Front.Main Street Study Updates.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 8:24:19 AM
Creation date
3/29/2024 8:09:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEER'S ESTIMATE <br />NW AREA <br />PEQUOT LAKES, MN <br />JANUARY, 2024 <br />ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED PRICE ESTIMATED QUANTITY TOTAL COST <br />1 ROADWAY LIN FIT 350.00$ 14000 4,900,000.00$ <br />2 WATERMAIN LIN FIT 200.00$ 14350 2,870,000.00$ <br />3 SANITARY SEWER LIN FT 350.00$ 13200 4,620,000.00$ <br />4 STORM SEWER LIN FT 250.00$ 14000 3,500,000.00$ <br />SUBTOTAL 15,890,000.00$ <br />ESTIMATED CONSTRUCTION COST:15,890,000.00$ <br />CONTINGENCIES (15%)2,383,500.00$ <br />SUBTOTAL:18,273,500.00$ <br />ENGINEERING (15%):2,741,025.00$ <br />LEGAL AND OTHER COSTS (2%):365,470.00$ <br />ADMINISTRATION (2%):365,470.00$ <br />ESTIMATED TOTAL PROJECT COST:21,745,465.00$ <br />NOTE: <br />SANITARY SEWER LIFT STATIONS NOT INCLUDED. <br />DRAFT - FEBRUARY 5TH, 2024
The URL can be used to link to this page
Your browser does not support the video tag.