Laserfiche WebLink
City of <br /> Pe ?__ AGENDA ITEM #10.2. <br /> _ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Sandy Peine, City Clerk <br /> Date: April 7, 2015 <br /> Subject: Highway 371 —Bridge Committee <br /> Report: The City received a call from Jim Hallgren, MnDOT, informing <br /> us that we should pull together a committee to assist with the designing of <br /> the two bridges related to the Highway 371 project (the bridge at the <br /> interchange and the Paul Bunyan Trail bridge). We will have to work within <br /> the DNR and MnDOT's parameters for the bridges but anticipate that we <br /> may be able to choose colors, adornments and textural styles. <br /> Staff is recommending a committee to be made up of the following: <br /> • WSN—Bridge Design Engineer <br /> • EDC Member <br /> • Council Member Sjoblad <br /> • Council Member Karr <br /> • Mike Loven <br /> • Dawn Bittner <br /> • Sandy Peine <br /> Council Action Requested: Council motion appointing a committee to <br /> work on the Highway 371 bridge designs. <br />