CITY OF PEQUOT LAKES—CROW WING COUNTY <br /> TH 371 PROJECT RELATED ROADWAY IMPACTS AND REVOCATIONS <br /> FEBRUARY 3,2015 <br /> CSAH 11 from proposed bypass to the west <br /> Current City estimate for lump sum turnback=$720,000 <br /> Current County estimate for lump sum turnback=$598,000 <br /> Bergquist Drive to bypass—full urban reconstruction <br /> Exist.TH 371 to Bergquist—2"mill and overlay,storm sewer and curb&gutter rehabilitation <br /> West of exist.TH 371—2"mill and overlay,storm sewer and curb&gutter rehabilitation <br /> CR 112 from CSAH 11 to new alignment <br /> Current City estimate for lump sum turnback=$954,000 <br /> Current County estimate for lump sum turnback=$633,000 <br /> CSAH 11 to E.Sibley St.—full urban reconstruction with 8'shoulders <br /> E.Sibley St.to new alignment—2"overlay with widening to provide 4'paved shoulders <br /> New alignment to cul-de-sac—removed as City desires this to become a private drive <br /> Variables used to calculate the estimates shown above include the County cost share policy,future <br /> inflation, contingencies,design engineering, construction and right-of-way. <br /> Total City estimate=$1,674,000 <br /> Total County estimate=$1,231,000 <br /> Average=$1,452,500 <br /> TH 371 from CR 168 to CSAH 17 <br /> The County has negotiated with MnDOT an amount of$4.2 million to accept jurisdiction of this roadway <br /> segment. The major items used when estimating are listed below: <br /> CR 168 to Woodman St.—full depth reclamation and resurfacing at existing width <br /> Woodman St.to W.Sibley St.—full urban reconstruction including roundabout at CSAH 11 <br /> W.Sibley St.to CSAH 17—full depth reclamation and resurfacing at existing width <br /> TH 371 Interchange <br /> MnDOT cost share procedures lead to a 70%state/30%local breakdown for the interchange. The <br /> County is proposing the same cost share with the city,whereas the City would pay 30%of the County <br /> cost,or 9%of the total interchange. At a current total estimate of$6.2 million,the City share would be <br /> $558,000. <br /> Overall Scenario <br /> The City accepts portions of CSAH 11,CR 112 and TH 371 identified above, along with a lump sum <br /> payment of$5,652,000 using the$1,452,500 average estimate for CSAH 11 and CR 112. <br /> The City has an estimated interchange obligation of$558,000. <br /> Assumptions <br /> • A cost share/turnback agreement is entered into between the City and County in 2015. <br /> • When CSAH 11 and CR 112 are turned back, it will be done with an estimated payment of <br /> $984,500(estimated lump sum payment minus interchange obligation) <br /> • TH 371 segment will be turned back to the City with a$4.2 lump sum payment <br /> • The current schedule would have these turnbacks occurring in July of 2018. <br />