My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1 City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
05-01-2023 Council Meeting
>
3.1 City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 4:47:02 PM
Creation date
1/3/2024 3:00:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br />April 3, 2023 <br />Page 3 of 10 <br />Ms. Leverson said in the PER that Mr. Houle talked about there are some <br />alternatives to doing this project. She said for the Gravdahl lift station the city can <br />replace it, fix different pieces of it, or do nothing to it and move forward. She said <br />for the force main the city could be lining the existing force main as an <br />alternative, could be adding additional lines, could just remove and replace, or do <br />nothing. She said the city decided to remove and replace both issues. She said <br />when they look at the potential funding sources for this type of a project, they <br />look at these different funding sources. She stated as Mr. Houle mentioned, <br />Rural Development, so USDA rural development has funding that is loan and <br />grant funding. She said the loans go out for forty years and grants are based on <br />affordability of the community, what they determine is affordable. She said both <br />the rural development and PFA are considered primary funders for things like <br />this. She said the PFA-Minnesota Public Facilities Authority do low interest loans <br />and their rates are between a one and two percent rate now for interest. Ms. <br />Leverson said they lock in the rate when the loan closes. She said they also have <br />loan forgiveness based on affordability. She said these are twenty to thirty years. <br />Ms. Leverson said another funding source is the Small Cities Program, which is <br />this program that gives up to $600,000 to use. She said $580,000 would be used <br />for the construction and $20,000 would be used for administration of the project. <br />She said a city can also do bonding and bond at whatever term you want, or you <br />can pay with cash on hand. <br />Ms. Leverson said the overall cost and proposed funding that they are looking at <br />the Force main construction ends up being about $651,000, the lift station <br />$447,000. She said these costs include engineering, property acquisition which <br />include easements, and administration and legal expenses. She said the total <br />cost estimate is about $1.4 million. She stated these are estimates the engineers <br />put together based on experience and the real costs do not come in until the city <br />bids the project. She stated they are proposing doing a PFA low interest loan for <br />811,000 or whatever the city chooses to finance, and small cities grant for <br />600,000..She said that will bring it up to $1.4 million. She explained other <br />programs that are available. She said the Minnesota Public Facility program is <br />state funds that comes from the state legislature, and they call it the clean Water <br />Revolving Fund. She said it helps communities build their upgrade and <br />wastewater treatment needs to comply with discharge standards set up by the <br />Clean Water Act. She said this is the one that they work hard to get projects on <br />the PPL list and then the IUP list, so they are on the list when PFA is ready to go. <br />She said this is the one that provides low interest loans and forgivable loans. She <br />said they are waiting for the state to open things up with the bonding bill. <br />Discussion ensued about easements. <br />Ms. Leverson said the next funding source is the Small Cities Development <br />Program which is federal funding that comes from the Housing and Urban <br />Development. She said this bank account at the federal government gets passed <br />to the state of Minnesota to Deed and then Deed releases the funding. She said <br />cities can apply for housing and other things, but the city is applying for public <br />infrastructure and the maximum request is $600,000. She said that includes <br />$20,000 for grant administration and $580,000 for the project. She explained the <br />schedule that Tim Houle worked on, and that engineering work will need to be <br />
The URL can be used to link to this page
Your browser does not support the video tag.