Laserfiche WebLink
City of Pequ&IITI� <br />Lakes - <br />Water/Wastewater Report — March 2023 <br />Water Dept. <br />FacilitN Performance for February 2023: <br />Flow <br />Average daily gallons pumped: <br />103,000 gallons <br />Maximum daily gallons pumped: <br />125,000 gallons <br />Minimum daily gallons pumped: <br />73,000 gallons <br />Total monthly gallons pumped: <br />3,085,000 gallons <br />Wastewater Dept. <br />Facility Performance for February 2023: <br />Flow <br />Average Daily Flow: 68,151 gallons (Design—121,795 gal/day) <br />Maximum Daily Flow: 77,530 gallons <br />Minimum Daily Flo 58,131 gallons <br />Total Monthly Flow: 2,112,682 gallons <br />Operations Report <br />1) Water treatment facility inspections were completed daily. <br />2) Wastewater pond and facilities checks were done each Monday, Wednesday and Friday <br />3) Monthly lift station preventative maintenance was completed on 3/15. <br />4) Weekly water testing was completed each Monday. <br />5) Quarterly wastewater sampling was done in both Pequot Lakes and Lake Shore. <br />6) Water meters were read on 3/21. <br />7) Monthly Fluoride Report was submitted to Minnesota Department of Health on 3/6. <br />8) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 3/6. <br />9) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 3/15. <br />10) I attended continuing education for my wastewater license in St. Cloud in early March. <br />11) Aeration blower rebuilds are taking longer than expected, so I purchased and installed a <br />new blower in mid -March and will keep one of the rebuilt units on the shelf as a spare. <br />12) There were a couple sewer callouts in Lake Shore in March. <br />Respectfully Submitted by Andy Schwartz, Water/Wastewater Operations Manager, City of <br />Pequot Lakes. Please feel free to call my cell at 320-232-5787 with any questions or concerns. <br />