My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1 Public Wroks Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
04-03-2023 Council Meeting
>
9.1 Public Wroks Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:59:09 PM
Creation date
1/3/2024 2:36:43 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pequ&IITI� <br />Lakes - <br />Water/Wastewater Report — March 2023 <br />Water Dept. <br />FacilitN Performance for February 2023: <br />Flow <br />Average daily gallons pumped: <br />103,000 gallons <br />Maximum daily gallons pumped: <br />125,000 gallons <br />Minimum daily gallons pumped: <br />73,000 gallons <br />Total monthly gallons pumped: <br />3,085,000 gallons <br />Wastewater Dept. <br />Facility Performance for February 2023: <br />Flow <br />Average Daily Flow: 68,151 gallons (Design—121,795 gal/day) <br />Maximum Daily Flow: 77,530 gallons <br />Minimum Daily Flo 58,131 gallons <br />Total Monthly Flow: 2,112,682 gallons <br />Operations Report <br />1) Water treatment facility inspections were completed daily. <br />2) Wastewater pond and facilities checks were done each Monday, Wednesday and Friday <br />3) Monthly lift station preventative maintenance was completed on 3/15. <br />4) Weekly water testing was completed each Monday. <br />5) Quarterly wastewater sampling was done in both Pequot Lakes and Lake Shore. <br />6) Water meters were read on 3/21. <br />7) Monthly Fluoride Report was submitted to Minnesota Department of Health on 3/6. <br />8) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 3/6. <br />9) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 3/15. <br />10) I attended continuing education for my wastewater license in St. Cloud in early March. <br />11) Aeration blower rebuilds are taking longer than expected, so I purchased and installed a <br />new blower in mid -March and will keep one of the rebuilt units on the shelf as a spare. <br />12) There were a couple sewer callouts in Lake Shore in March. <br />Respectfully Submitted by Andy Schwartz, Water/Wastewater Operations Manager, City of <br />Pequot Lakes. Please feel free to call my cell at 320-232-5787 with any questions or concerns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.