Laserfiche WebLink
Average user rates per household - monthly <br />Proposed timeline <br />Current Estimated future <br />$43.84 $103.67 <br />Enter the information as applicable below. All dates should be entered with the month and year each line is <br />proposed to be completed. <br />• Date all engineering work completed: 10/2023 <br />• Does community have site control? ®Yes El No <br />o Date secured: NA <br />The City of Pequot Lakes has Prescriptive Site Control —The new forcemain will be installed next to existing <br />forcemain. A recorded Right of Way will be sought for funders, if required. <br />o If the community does not have site control, when will it be secured? NA <br />• All necessary permits obtained: 11/2023 <br />• Completion of SCDP Environmental Review: 8/2023 <br />• Bid process conducted: 1/2024 <br />• Award construction contract: 2/2024 <br />• Facility operational: 10/2024 <br />• All construction (including turf restoration) complete: 10/2024 <br />Small Cities Development Program (SCDP) 2023 Full Proposal Public Facilities Infrastructure 16 <br />