Laserfiche WebLink
➢ Assisted with removing heavy debris from the bottom and cleaning off <br /> the intake screens for the pumps while assisting in the equipment <br /> handling to the repair person. <br /> ➢ Were able to remove one test ball from the secondary pond,while the <br /> other one required the assistance from the diver. <br /> ➢ With both gates in the closed position,water from the secondary pond <br /> was still leaking back into the pit. After the water level stabilized,the <br /> gate to the primary pond is holding the water back from entering the <br /> pond. <br /> ➢ Water from the secondary was then lowered back to the primary pond <br /> for winter. <br /> • The pumping pit has been covered with insulation and a tarp to minimize water <br /> freezing. <br /> • All fall maintenance has been completed on all the irrigators and the system <br /> prepared for winter. <br /> • Have calculated pond storage availability for winter and will have enough for the <br /> winter months. <br /> Miscellaneous: <br /> The Mutual Aid agreement with Pine River has been working out fine and would ask <br /> to extend this agreement for another year.Refer to attached letter: <br /> Report Submitted By: Gary Giltner <br /> Water/Wastewater Supervisor <br /> City of Peauot Lakes <br /> 3 <br />