My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 Safe Routes to Schools Presentation
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
09-05-2023 Council Meeting
>
5.2 Safe Routes to Schools Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2023 1:25:52 PM
Creation date
9/1/2023 1:25:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTRODUCTION - ORGANIZATION OF THIS REPORT <br /> This report is designed to support multiple groups of people involved with Safe Routes to School in the <br /> Pequot Lakes School District,including students,caregivers,teachers,school administrators,public works <br /> staff,elected officials,and county and state employees.To help make the body of this report relevant to <br /> all readers—while also documenting all of the participation,analysis,and deliberation that went into <br /> development of the plan—some content has been moved to the Appendices. <br /> SRTS programs examine conditions around schools and conduct projects and activities that work to <br /> improve safety and accessibility and reduce traffic and air pollution near schools.Thus,these programs <br /> help make bicycling and walking to school safer and more appealing transportation choices thus <br /> encouraging a healthy and active lifestyle from an early age. <br /> The Region Five Development Commission(R5DC)has successfully developed numerous Safe Routes to <br /> School Plans for communities throughout the region,over many years.The Region Five Development <br /> Commission assists local units of governments and schools in all aspects of Safe Routes to School <br /> planning including developing a planning team,facilitating public informational meetings,facilitating <br /> planning team work sessions,administering both student and parent surveys,conducting local walk- <br /> audits,drafting the planning document itself,assisting in the adoption process,and much more. <br /> PLANNING PROCESS <br /> The Region Five Development Commission working in cooperation with the Pequot Lakes School District <br /> have developed this SRTS plan through the efforts of an ad-hoc community group of volunteers,school <br /> staff,State Health Improvement Plan(SHIP)coordinator,and professional planning consultants.This local <br /> planning team collected and analyzed information,identified issues,barriers,community needs and <br /> priorities,and developed recommendations designed to increase bicycle and pedestrian safety for <br /> students. <br /> METHODOLOGY <br /> The charge of the planning team was to provide oversight of the overall planning process as well as to <br /> provide vital input regarding issues and barriers to safety of students walking or bicycling to and from <br /> school;to identify areas of concern as well as to set forth a vision that will guide future transportation <br /> planning related to SRTS. <br /> PLANNING TEAM <br /> After being awarded the Technical Assistance grant from the Minnesota Department of Transportation <br /> (MnDOT)in 2022,the Pequot Lakes School District staff,in coordination with the Region Five <br /> Development Commission began developing a local planning team(LPT)that would represent a diverse <br /> cross section of the community.The planning team was designed to both articulate the needs of the <br /> community as they relate to SRTS as well as develop strategies and recommendations going forward.The <br /> planning team was comprised of several key stakeholders from diverse backgrounds and areas of <br /> expertise including elected officials,tribal transportation planners,educators,engineers, members of law <br /> enforcement,local transportation planners,parents,community members as well as local transportation <br /> planners. <br /> The Local Planning Team(LPT)communicated via email and met several times throughout 2022 and 2023. <br /> LPT members also oversaw the administration of both the parent survey and the in-class student tally. <br /> Additionally,the LPT conducted a walk audit and a hazard observation of school drop off and pick up at <br /> 5 I Minnesota Safe Routes to School t 4 tr Al6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.